HomeMy WebLinkAbout19 026 2019 Budget By-law THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE
KBT
470PALITY OF K1No
BY-LAW
No. 2019 - 026
BEING A BY-LAW TO ADOPT THE ESTIMATES OF ALL SUMS REQUIRED
DURING THE YEAR 2019
WHEREAS Section 290 of the Municipal Act, 2001, S.O. 2001, c. 25, as
amended, provides that for each year, a local municipality shall, in the year or the
immediately preceding year, prepare and adopt a budget including estimates of all
sums required during the year for the purposes of the municipality;
• NOW THEREFORE the Council of The Corporation of the Municipality of
Kincardine ENACTS as follows:
1. That the estimates, attached hereto as Schedule 'A', the 2019 Operating
Budget Summary and Schedule 'B', the 2019 Capital Budget Summary,
and forming part of this by-law, be adopted as the budget for the year
2019.
2. This by-law shall come into full force and effect upon its final passage.
3. This By-law may be cited as the "2019 Budget By-law".
READ a FIRST and SECOND TIME this 20th day of February, 2019.
READ a THIRD TIME and FINALLY PASSED this 20th day of February, 2019.
• Mayor Clerk
•
2019 Operational Budget Summary
Schedule A to By-Law No. 2019 - 026
Comparison to 2018
2018 Budget 2019 Budget $ Change % Change
• Revenue
Taxation 16,258,229 17,282,512 1,024,283 6.3%
General Government
Council 17,159 17,000 (159) -0.9%
CAO 70,200 72,300 2,100 3.0%
Treasury 2,713,600 2,852,500 138,900 5.1%
Clerk 75,046 18,770 (56,276) -75.0%
Economic Development - - 0 0.0%
Tourism 38,400 28,900 (9,500) -24.7%
Protective Services
Fire 280,400 170,900 (109,500) -39.1%
Police 57,967 56,400 (1,567) -2.7%
Public Works
• General 979,492 1,098,718 119,226 12.2%
Water&Sewer 4,850,282 5,490,070 639,788 13.2%
Recreation 1,562,027 1,617,939 55,912 3.6%
Building&Planning 1,050,100 935,805 (114,295) -10.9%
Total Revenue $ 27,952,902 $ 29,641,814 1,688,912 6.0%
Expense
General Government
Council 442,016 482,723 40,707 9.2%
CAO 437,223 518,814 81,591 18.7%
Treasury 2,186,132 2,057,608 (128,524) -5.9%
Clerk 527,356 598,092 70,736 13.4%
Economic Development 111,123 239,615 128,492 115.6%
Tourism 316,363 323,177 6,814 2.2%
4,020,213 4,220,028 199,815 5.0%
Protective Services
• Fire 1,344,985
2,210,040 1,256,783 (88,202) -6.6%
Police 2,280,920 70,880 3.2%
3,555,025 3,537,703 (17,322) -0.5%
Public Works
General 6,096,367 6,518,515 422,148 6.9%
Water&Sewer(incl. RF 4,850,280 5,490,070 639,790 13.2%
transfers) 10,946,647 12,008,585 1,061,938 9.7%
Recreation 4,192,940 4,320,925 127,985 3.1%
Building&Planning 2,778,077 2,674,574 (103,503) -3.7%
Total Expense $25,492,902 $ 26,761,814 1,268,912 5.0%
Contribution to Capital 2,460,000 2,880,000 420,000 17.1%
Surplus(Deficit) $ 0 $ (0)
4110
MLIR,4,,..1 1 rY ar
l(INCA�DINrCapital Budget Summary 2019
ScheduleStoBy-Law No.2019-026
great energy.baloncod life.
New or
Existing Dept. Project Description Estimated Cost Reserve Funded Other Funds Reserve Fund#
Asset
1 Existing Buildings Lighthouse Restoration Final Phase-Lighthouse siding and windows lower $ 375,000 $ 375,000 82-Lifecycle RF;
level 15-Lighthouse RF
2 Existing Buildings Kincardine Library steps Replacement of library exterior steps $ 50,000 $ 50,000 82-Lifecycle RF;
15-Lighthouse RF
3 Existing Buildings Riggin Bank Repair Repair Riggin bank due to erosion $ 50,000 $ 50,000 82-Lifecycle RF
4 New Buildings Medical Clinic Key System Medical Clinic Key System $ 20,000 $ 20,000 82-Lifecycle RF
5 Existing Equipment Kincardine Medical Clinic Replacement of existing server $ 16,000 $ 16,000 82-Lifecycle RF
Roof replacement -Arts Centre, Originally included in 2018 budget at Airport=$50K, 56-Arts Center RF;
6 Existing Shared Tiverton Library,Airport Terminal Tiverton Library=$7K,and Arts Centre=$100K. $ 407,000 $ 407,000 82-Lifecycle RF
Revised budget for Arts Centre=$350K
7 New Clerk Electronic Agenda Management New software for electronic agenda management $ 15,000 $ 15,000 49-Equipt Repl RF Clerk
8 New Clerk Heritage Conservation Study Study regarding designation of Princes St&Queen St $ 45,000 $ 45,000 82-Lifecycle RF
areas as a Heritage Conservation District
9 New Clerk-Tourism Sound System New sound system for downtown events(Cruise Night, $ 20,000 $ 10,000 $ 10,000 60-Tourism RF;
BIA,etc) 50%Donation
10 New Fire Fire Training Facility Completion of training grounds $ 47,500 $ 47,500 49-Equip Fund-Fire
11 Existing Fire Replace fire dept van Replace 2009 Fire department CEMC van $ 30,000 $ 30,000 82-Lifecycle RF;
49-Emergency Measures
12 Existing Fire Tanker truck Replacement of 1995 Tanker $ 400,000 $ 200,000 $ 200,000 82-Lifecycle RF
Update AMP to be inline with new regulations-
13 Existing Treasury Asset Management Plan&Software proposed service levels,state of local infrastructure, $ 138,000 $ 138,000 Contingency/Capital Reserve
financial strategy,etc.Includes budgeting software
i.
Approved in 2018 for$785K-Construction of new 49-Equip Fund-Landfill/
14 New PW Landfill KWMC Stage 2 Cell Expansion landfill cell $ 965,000 $ 965,000 75-Community Benefits RF/
82-Lifecycle RF
Construct initial phase including water,storm,sanitary OPG LLW Payment=$450K
15 New Development 9&21 Initial Phase and roads $ 4,265,000 $ 4,265,000 External Loan=$3.815 M
16 Existing PW Roads Reconstruction Concession 5 from BR23 to West end-storm sewer $ 755,000 $ 167,169 $ 587,831 OCIF Formula Funding;
and paving RNS#21033 82-Lifecycle RF
Kincardine Kinloss Boundary-Huron Kincardine to 82-Lifecycle RF;Shared
17 Existing PW Roads Rural Paving South Line-pulverize,shape and place 50mm HL4 $ 350,000 $ 175,000 $ 175,000 50%with Huron-Kinloss
RNS#21007(2 kms)
Sideroad 15-Con 7 to 9,Con 9 to 11&Con 11 to 75-Community Benefits RF;
18 Existing PW Roads Rural Paving BR15-pulverize,shape and place 50mm HL4 RNS# $ 925,000 $ 280,000 $ 645,000 82-Lifecycle RF
21073,21074,21075(6 kms)
19 New PW Roads Storm Sewer Improvements Kennard Sump issues $ 50,000 $ 50,000 82-Lifecycle RF
20 Existing PW Roads Underwood Shop Repave Underwood shop parking lot $ 90,000 $ 90,000 82-Lifecycle RF
21 Existing PW Roads Guard Rail Miscellaneous guardrail repairs $ 50,000 $ 50,000 82-Lifecycle RF
22 New PW Roads Storm Sewer Improvements Engineering-design and approvals for Inverhuron $ 30,000 $ 30,000 82-Lifecycle RF
Storm improvements-BR15
23 New PW Roads Storm Sewer Improvements Engineering-Lake Street South(north end) $ 10,000 $ 10,000 82-Lifecycle RF
24 New PW Roads Storm Sewer Improvements Engineering-Albert Rd drainage $ 15,000 $ 15,000 82-Lifecycle RF
25 Existing PW Fleet Pickup truck Replace patrol truck-3405 $ 40,000 $ 40,000 82-Lifecycle RF
26 Existing PW Fleet Loader Replace 3442 $ 255,000 $ 255,000 82-Lifecycle RF
muNic� ,,r�r1 Capital Budget Summary 2019
i K I N C/\ID I N L Schedule B to By-Law No.2019-026
veal energy.bolonced life.
New or
Existing Dept. Project Description Estimated Cost Reserve Funded Other Funds Reserve Fund#
Asset
27 Existing PW Fleet Plow Truck Replace 3482 $ 325,000 $ 325,000 Contingency/Capital Reserve
28 New PW Equip Welder Purchase of a new welder to allow for welding $ 14,000 $ 14,000 82-Lifecycle RF
aluminum
29 Existing PW Cemetery 5557 John Deere X748 4WD Mower Replace existing with zero turn $ 15,000 $ 15,000 82-Lifecycle RF
30 New PW Cemetery Fleet Trailer for transporting mowers $ 10,000 $ 10,000 Contingency/Capital Reserve
31 Existing PW Bridges Structure 2206 Repairs-patch beam ends and bearing seats $ 145,000 $ 145,000 82-Lifecycle RF
32 Existing PW Bridges Structure 2201(Queen St Bridge) Engineering/design for rehabilitation project(2020); $ 200,000 $ 200,000 82-Lifecycle RF
repair gabion basket retaining walls in 2019
33 Existing PW Bridges Misc Replacement Replace culverts on Con 2,Con 5,South Line&Con 7 $ 70,000 $ 70,000 Contingency/Capital Reserve
34 Existing PW Trails Mechanics Foot Path Construct accessible access and remove existing $ 30,000 $ 30,000 82-Lifecycle RF
safety issues
35 New PW Trails Trail Signage New trail head signage throughout trail network $ 15,000 $ 15,000 82-Lifecycle RF
36 New PW Trails Stonehaven Park Trail Trail paving of Stonehaven Park trail $ 10,000 $ 10,000 63-Trails RF
37 Existing Parks&Rec Bervie Park Playground Replacement and surfacing $ 40,000 $ 40,000 82-Lifecycle RF
38 Existing Parks&Rec New Ice Resurfaces for D.C.Arena Replace 2004 existing Olympia that is beyond its useful $ 85,000 $ 85,000 82-Lifecycle RF
life
39 Existing Parks&Rec Connaught Park Grandstand Demolish Grandstand due to safety concerns $ 30,000 $ 30,000 72-Recreation RF Parks
40 New Parks&Rec Davidson Centre Pool Feasibility Report $ 50,000 $ 50,000 82-Lifecycle RF
41 Existing Parks&Rec Tiverton Sports Centre HVAC Replacement(replace 1 unit) $ 22,000 $ 22,000 72-Rec Tiverton SC RF;
82-Lifecycle RF
42 New Parks&Rec Davidson Centre Recreation program registration software $ 60,000 $ 60,000 82-Lifecycle RF
43 New Parks&Rec Connaught Park parking lot Pave Connaught Park parking lot $ 45,000 $ 45,000 67-Sewer;82-Lifecycle
44 Existing PW Water BEC water tower Approved in 2018 for$150K-Coating and repairs $ 415,000 $ 415,000 68-BEC Water
45 Existing PW Water Tiverton Water Tower Replace PLC and new fire pump $ 500,000 $ 154,500 $ 345,500 2019 Gas Tax Allocation;
24-Tiverton Water RF
46 Existing PW Water Kincardine Standpipe Replace existing fire pump $ 500,000 $ 500,000 68-Kincardine Water
47 Existing PW Water KWTP Rebuild high lift pumps $ 200,000 $ 200,000 68-Kincardine Water
48 New PW Water Valve Turning trailer Purchase a valve turning unit to address MOEP&H/S $ 90,000 $ 90,000 68-Kincardine Water
49 New PW Sewer BEC lagoons UV UV or Dechlorination system by Dec 31,2020- $ 250,000 $ 250,000 68-BEC Water
Engineering and Approvals in 2019
Expanded scope for engineering work for Durham St
50 Existing PW Sewer Pump Stations and Huron Terrace pump stations(2018 budget= $ 500,000 $ 500,000 67-Sewer
$200K)
51 Existing Buildings Connaught Park Electrical Building Install catch basin and pump to address safety $ 9,500 $ 9,500 82-Lifecycle RF
concerns over flooding
Existing PW Water Hydrant replacement contingency $ 10,000 $ 10,000 68-Municipal Water
Existing PW Water Water meter replacement contingency $ 12,000 $ 12,000 68-Municipal Water
Existing PW Water Kincardine water contingency $ 15,000 $ 15,000 68-Municipal Water
Existing PW Water Tiverton water contingency $ 10,000 $ 10,000 24-Tiverton Water
Existing PW Sewer Pumping station upgrades contingency - $ 15,000 $ 15,000 67-Sewer
Existing PW Sewer Sewer Contingency $ 15,000 $ 15,000 67-Sewer
Total 2019 Projects $ 13,121,000 $ 6,892,669 $ 6,228,331