Loading...
HomeMy WebLinkAboutBRU 96 018 Amended By No 97 18 {b ,,' -\ THE CORPORATION OF THE TOWNSHIP OF BRUCE ~CI¡ '0' \ ¡, LJ - ,? - "~I' ,.J,f'Í \'" (Y Q/" BY-LAN NO. 96-18 -4 BEING A BY-LAW to authorize the maintenance of the MacDonald Drain 1975 in the Township of Bruce and the payment therefore by the lands and roads affected. WHEREAS the Council of the Township of Bruce has received a request for the maintenance of the MacDonald Drain 1975, as is more particularly delineated in red on the plan attached hereto as Schedule nA". AND WHEREAS this municipal drain was constructed after a report by A. W. Clark, P. Eng., dated 21 December 1975 and approved by By-law No. 76-4 of the Corporation of the Township of Bruce, being the current by-law. AND WHEREAS the Council of the Township of Bruce now desires to proceed with the maintenance of a portion of this drain without obtaining the report of an Engineer, in accordance with Sections 74 and 75 of The Drainage Act. AND WHEREAS in accordance with Section 74 of The Act, the cost of the maintenance of municipal drains is to be at the expense of all the upstream lands and roads in any way assessed for the construction or improvement of the drainage works and in the proportion determined by the current by-law pertaining thereto. AND WHEREAS the estimated cost of this maintenance is $6,500.00 (six thousand five hundred). AND WHEREAS $6,500.00 is the amount to be contributed by the lands and roads in the Township of Bruce for the maintenance of this municipal drain. AND WHEREAS the Council of the Township of Bruce is of the opinion that the maintenance of this municipal drain is desirable. --e NOW THEREFORE the Council of the said Township of Bruce pursuant to the provisions of The Drainage Act, enacts as follows: Firstly: That the following repairs are hereby authorized and shall be completed in accordance herewith; bottom only clean out of open drain from upstream side of Concession 10-11 culvert easterly for approximately 3,700 feet. Spoil to be hauled away. Addition riprap protection installed. THE CORPORATION OF THE TOWNSHIP OF BRUCE BY-LAW NO. 96-18 PAGE 2 . Secondly: The amount of $6,500,00 necessary to be raised by the Township of Bruce for such drainage works, shall be made a cash assessment upon the lands and roads affected by the said municipal drain. Thirdly: This by-law comes into force and takes effect upon the final passing thereof and may be cited as the MacDonald Drain 1975, Maintenance By-law, 1996. Read a First time this THIRTEENTH day of AUGUST, 1996. Read a Second time this THIRTEENTH day of AUGUST, 1996. provisionally adopted this THIRTEENTH day of AUGUST, 1996. $t!Jútc-- ~~ CLERK REEVE Read a Third time and finally passed this OCTOBER, 1996. EIGHTH day of ~ CLERK ~/¿4 REEVE SEAL -' ___.: > _/ ~----- --~ -- 'S..:,,"":.. ~. / " ".' "0 "/_-. .....- ---:-:~-~----- .--- ~ . ' --. THE CORPORATION OF THE TOWNSHIP OF BRUCE BY-LAW NO. 96-18 (SCHEDULE 'A') PAGE 3 ,f ./ ,; "," -e SCHEDULE OF PRORATED ASSESSMENTS TOWNSHIP OF BRUCE MacDonald Drain Repair 1996 ORIGINAL ASSESSMENTS ESTIMATED REPAIR ASSESSMENTS REPORT $16,111.51 COST= $6,500.00 SECT 26= SECT 26= A~t 1996 ----------- ------------ ORIGINAL TOTAL= $16,111.51 BALANCE= $6,500.00 PRORATING= 0.403438287 AGRIæLTURAL LANDS FAGl'OR ------------------ ------------------ CON wr ORIGINAL OWNER ORIGINAL PRORATED GRANT ALLOWANCE NET ASSESSMENT ASSESSMENT ASSESSMENT 11 23 Lewis $1,633.95 $659.20 $219.73 $0.00 $439.47 24 Lewis $1,018.15 $410.76 $136.92 $0.00 $273.84 WH25 Lewis $509.25 $205.45 $68.48 $0.00 $136.97 EH25 MeLean $258.60 $104.33 $34.78 $0.00 $69.55 10 22 ARDA $937.46 $378.21 $126.07 $0.00 $252.14 23 ARDA $1,561.15 $629.83 $209.94 $0.00 $419.89 pt24 Lewis $1,248041 $503.66 $167.89 $0.00 $335.77 pt24 Snyder $775.81 $312.99 $104.33 $0.00 $208.66 25 Kononiuk $942.02 $380.05 $126.68 $0.00 $253.36 WH26 Kononiuk $979.98 $395.36 $131. 79 $0.00 $263.57 006 Anness $672.35 $271.25 $90.42 $0.00 $180.83 27 Brown $729.98 $294.50 $98.17 $0.00 $196.33 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ---------------------------------------------------------- ---------------------------------------------------------- TOTAL LANDS $11,267.11 $4,545.58 $1,515.19 ROADS AND NON-AGRICULTURAL LANDS $0.00 $3,030.39 -------------------------------- -------------------------------- Cone. Rd. 10/11 SR 25 $4,768.05 $1,923.61 $76.35 $30.80 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,923.61 $30.80 $0.00 $0.00 ---------------------------------------------------------- ---------------------------------------------------------- TOTAL ROADS AND NON-AG $4,844.40 $1,954.42 $0.00 $0.00 $1,954.42 ---------------------------------------------------------- ---------------------------------------------------------- TOTALS FOR PROJECT $16,111.51 $6,500.00 $1,515.19 \ $0.00 $4,984.81 . "'- TnTI:II 1'."'1