THE CORPORATION OF THE TOWNSHIP OF KINCARDINE
BY-LAW NO. 91-39
A BY-LAW TO AUTHORIZE the execution of a proposal and
estimate of project cost pursuant to an agreement with Her
Majesty the Queen, In Right of the Province of Ontario, as
represented by the Minister of Transportation, entered into under
the Public Transportation and Highway Improvement Act, R.S.O.
1980, Chapter 421.
"WHEREAS the appended proposal and estimate of project cost
dated the 4th day of November 1991, for the construction of the
structure replacement of the Moore Bridge, Site 2-253 on
Kincardine Township Road #25 has been prepared pursuant to the
said agreement with Her Majesty the Queen, In Right of the
Province of Ontario, as represented by the said Minister."
BE IT THEREFORE ENACTED by the Council of the Corporation of
the Township of Kincardine:
1. That the hereinbefore recited proposal and estimate of
project cost be approved.
2. That the Reeve and Clerk be and they are hereby
authorized and directed to sign the hereinbefore
recited proposal and estimate of project cost and to
affix thereto the seal of the Corporation.
3. That this By-Law be given a first, second, and third
reading and finally passed, signed and sealed by the
Council of the Corporation of the Township of
Kincardine this 4th day of November 1991.
xg~_----:~>
Reeve -- _ ~ -___<
., -" -
. ~.- =-
-: -~
::--.
?pùÞß!i;"j; .
·
·
· B)
·
~
'..
.,
t
2
APPENDIX NO.
1
DATE
.
PROPOSAL AND ESTIMATE OF PROJECT COST FOR THE CONSTRUCTION OF A
STRUCTURE REPLACEMENT IN THE TOWNSHIP OF KINCARDINE IN THE COUNTY OF
BRUCE ON TOWNSHIP ROAD #25 AT BERVIE.
Pursuant to Motion Number 16 dated the 7th day of Januarv 19~
the Corporation of the Township of Kincardine proposes that the
structure replacement be constructed by the Ministrv of TransDortation
namely:
Moore Bridae. site 2-253 at Bervie on Kincardine TownshiD Road #25:
In accordance with plans and specifications approved by the Minister
and the Corporation in the manner and at a total project cost estimated
and divided sUbstantially as follows:
A)
DIRECT COSTS
a) Estimate of Construction Costs
Includes:
- Services
- Supplies & Materials
- Equipment
- Contract Tender
(See Detailed Breakdown)
- Utilities (handled by Twp.)
$ 249,044.00 (1)
NIA
NIA
NIA
$ 249,044
NIA
b) Field Enqineerina and Sunervision
Contract Tender 3% on first 50,000 $
2% on next 50,000
1% on remaining 149,044
b) Ontario Hydro 3rd Party
Invoice (Utilities)
9.8% of (1)
c) Desian Enaineering
(Bridge design handled by
Township of Kincardine)
d) Material Handlina Costs
TOTAL DIRBCT COSTS
MINISTRY ADMINISTRATIVE OVERH~
a)
$ 24,406.31
NIA
N/A
$ 273,450.31 (2)
1,500.00
1,000.00
1,490.44
NIA
0) General Overhead on Remainder
of Direct Costs
15% of 24,406.31 (i.e. (2)-(1»
TOTAL MINISTRY ADMINIS'l'RATIVB OVBRBBAD
SUBTOTAL (2) + (3)
TOTAL PROJBCT COST
NOTE: N/AzNot Applicable
Oct-69A. 1
3.660.95
7,651.3t (3)
$281,101.70 (4)
GST
7% of (4) 19.677.12
$300,778.82
·
·
·
·
',.
~
i
.
.
-.1,
3
It is understood that the estimated total project cost is based on the
best information available for the Contract Tender at the time of
submission. Upon the award of the Contract, the total project cost
will be recalculated by the Minister of Transportation based upon the
contract tender cost revised using the actual tender quantities and
unit costs for each item.
This p~posal is hereby submitted this
"i day of ~/ 19,&: by
or on behalf of he Corporation of the
TownshiD of
Kincardine
(SEAL)
~L
Reeve
l£'h,.t--jJ~
Clerk
and is hereby accepted by or on behalf
of the Minister.
(SEAL)
(Note:
A statement of the Estimate of'Contract Tender Cost is
attached. )
Oct-69A.2
"
.
~.- .
.,
.
.
4
ESTIMATE OF CONTRACT TENDER COST
.
MOore Bridge, Si~e 2-253
A) S~ructure It.mB
Onit
1l.DU. OUantity coatIS' Tot.llS'
1. Removal of Structure L.S. 70,,.3 500.00 35,000
2. Onwatering Structure Excavation L.S. 15,000.00 15,000
3. Hass COncrete ,.3 6.5 430.00 2,795
4. concrete in Footings .3 38.9 310.00 12,059
5. concrete in Structure L.S. 124.4 450.00 55,980
6. Concrete in Barrier Walls L.a. 11.3 .3 1,000.00 11,300
7. Concrete in Approach Slabs L.S. 25.5 m3 280.00 7,140
8. Reinforcing Steel t 13.1 1,250.00 ' 16,375
9. Coated Reinforcing Steel t 6.6 1,650.00 10,890
10. Pedestrian Handrailing L.S. 43.6 . 300.00 13,080
11. Bridge Deck Waterproofing L.S. 86.7 ma 18.00 1,560
12. Embedded Work in Structure (Otility) L.S. 500.00 500
13. Deck Draine Ka 4 475.00 1.900
.
SOB-TOTAL PART (A)
$183,579
B) Road Items
IResultina directlv from Structure Reolacementl
14. Barth Excavation for Structure m3 553 12.00 6,636
15. Clearing Ea 6 400.00 2,400
16. Grubbing Ea 6 400.00 2,400
17. Subdrains (100 rom) ,. 25 19.00 475
18. Granular "B" Type I t 546 7.00 3,822
19. Granular "A" t 162 10.00 1,620
20. Concrete Curb & Gutter m 36 42.00 1,512
21. Rock Protection .a 229 80.00 18,320
22. GeotextUe .a, 284 2.50 710
23. Gabione mj 62 125.00 7,750
24. Gabion Structures m3 65 135.00 8,775
25. Geotextile .a 213 3.50 745
26. Steel Beam Guide Rail . 26 85.00 2,210
27. Eccentric Loader Ea 2 2000.00 4,000
. 28. Removal Steel Beam Guide RaU t 53 5.00 265
29. Hot Hix HL-4 t 85 45.00 3.825
SOB-TOTAL PART (B) $65,465
SOB-TOTAL PART (A) $ 183,579
SOB-TOTAL PART (B) S 6S.46S
..t:.i..t:.. o~ COD.t:.ract:. -render Coat:. .8249.0U