THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE
BY -LAW
NO. 2010 - 068
BEING A BY -LAW TO AUTHORIZE THE MAINTENANCE AND REPAIR OF A
MUNICIPAL DRAIN UNDER THE PROVISIONS OF
THE DRAINAGE ACT, R.S.O. 1990
(McDonald Municipal Drain)
WHEREAS By -law 4 1976 (Township of Bruce) of The Corporation of the
Municipality of Kincardine was passed by Council on December 21, 1975,
providing for the construction of the McDonald Municipal Drain, being the current
by -law;
AND WHEREAS Council wishes to maintain and repair this Drain, without a new
report of an Engineer, but in accordance with specifications outlined in the
current Engineer's Report dated December 21, 1975 prepared by A.W. Clark
Professional Engineers. as contained within the above - mentioned by -law;
AND WHEREAS in accordance with section 74 of the Drainage Act, the cost of
maintenance and repair of a Municipal Drain is to be at the expense of all the
upstream lands and roads in any way assessed for the construction or
improvement of the drainage works and in the proportion determined by the then
current by -law pertaining thereto;
AND WHEREAS the cost of this repair is $625.00;
AND WHEREAS $94.07 is the amount to be contributed by this Municipality for
repair of the municipal drain;
NOW THEREFORE the Council of The Corporation of the Municipality of
Kincardine ENACTS as follows:
1. That the McDonald Municipal Drain has been maintained and repaired to
the specifications outlined in the Engineer's Report dated December 21,
1975 as prepared by A.W. Clark Professional Engineers and contained
within the current by -law.
2. That the actual costs of this drainage repair and maintenance, attached
hereto as Schedule 'A', be assessed as per the current by -law less any
grant money received for lands eligible to receive agricultural grants.
3. That the amount of $448.02 necessary to be raised by this Municipality for
such drainage works shall be made a cash assessment upon the roads
and lands affected by the proposed work. All assessments are payable in
the first year in which the assessment is imposed.
.../2
•
•
•
4. For paying the amount of $94.07, being the amount assessed upon the
lands and roads belonging to or controlled by the Municipality, a special
rate sufficient to pay the amount assessed plus interest thereon shall be
levied upon the whole ratable property in the Municipality of Kincardine
after the passing of this by -law to be collected in the same manner and at
the same time as other taxes are collected.
5. This by -law shall come into full force and effect upon its final passage.
6. This by -law may be cited as the "2010 McDonald Municipal Drain
Maintenance By -law ".
READ a FIRST and SECOND TIME this 19 day of May, 2010.
Page 2
2010 McDonald Municipal Drain Maintenance By -Law
By -Law No. 2010 - 068
READ a THIRD TIME and FINALLY PASSED this 19 day of May, 2010.
ayor
Clerk U
Clerk r
Repair Cost =
Project Completion
Date
Conc. Lot
Agricultural Lands
Non - Agricultural Lands
Roll #
MAINTENANCE ASSESSMENT SCHEDULE
MUNICIPALITY OF KINCARDINE (WARD III)
McDONALD MUNICIPAL DRAIN - Tile Repair Lot 25, Concession 10
MAIN DRAIN - CLOSED PORTION
$625.00
30- Nov -09
Costs Percentage of Jan -10 grant
Benefit & Maintenance dollars
Outlet Costs as per
By -Law # By -Law # ADIP 2.3 c
u
ac Owner 76 - 4 76 - 4 Costs $ )
1/27/2010
-1852275
Costs
(1/3 grant
applied if
applicable)
10 25 4108 - 260- 003 - 04110 -0000 65 Ontario Peninsula Farms Ltd $2,534.01 43.79% $273.66 $91.22 $182.44
W 1/2 26 4108 - 260- 003 - 04200 -0000 38 Ontario Peninsula Farms Ltd $979.98 16.93% $105.83 $35.28 $70.55
E 1/2 26 4108 - 260- 003 - 04300 -0000 35 Claire Allen $672.35 11.62% $72.61 $24.20 $48.41
27 4108- 260- 003 - 04510 -0000 38 Ontario Peninsula Farms Ltd $729.98 12.61% $78.83 $26.28 $52.55
Total Assessment on Agricultural Lands $4,916.32 84.95% $530.93 $176.98 $353.95
Total Assessment on Non - Agricultural Lands $0.00 0.00% $0.00 $0.00
Roads
Sideroad 25 Municipality of Kincardine $76.35 1.32% $8.25 $8.25
(geographic Township of
Bruce)
Concession 10 -11 Municipality of Kincardine $794.68 13.73% $85.82 $85.82
(geographic Township of
Bruce)
Total Assessment on Roads $871.03 15.05% $94.07 $94.07
Total Assessment on Lands and Roads $5.787.35 100.00% $625.00 $448.02
Repair Cost =
Project Completion
Date
Conc. Lot
Agricultural Lands
11 21
22
23
24
W 1/2 25
10 20
21
22
23
Pt. 24
25
W 1/2 26
E 1/2 26
27
Non - Agricultural Lands
11 E 1/2 25
10 Pt. 24
Sideroad 25
Concession 10 -11
Total Assessment on Roads
MAINTENANCE ASSESSMENT SCHEDULE
MUNICIPALITY OF KINCARDINE (WARD III)
McDONALD MUNICIPAL DRAIN - Cleanout and Erosion Protection Lot 20, Concession 10
MAIN DRAIN - OPEN & CLOSED PORTIONS & "A" & "B" BRANCHES - CLOSED
Roll #
$1,482.14
20- Nov -09
4108 - 260 - 003 - 08500 -0000
4108- 260 - 003 - 08600 -0000
4108- 260- 003 - 08700 -0000
4108 - 260 - 003 - 08810 -0000
4108- 260- 003 - 08810 -0000
4108- 260- 003 - 03600 -0000
4108- 260- 003 - 03700 -0000
4108- 260 - 003 - 03900 -0000
4108- 260 - 003 - 03900 -0000
4108- 260- 003 - 04000 -0000
4108- 260 - 003 - 04110 -0000
4108- 260 - 003 - 04200 -0000
4108 - 260 - 003 - 04300 -0000
4108 - 260- 003 - 04510 -0000
Total Assessment on Agricultural Lands
4108 - 260 - 003 - 09000 -0000
4108 - 260- 003 - 04001 -0000
Total Assessment on Non - Agricultural Lands
Roads
Sideroad 20
Total Assessment on Lands and Roads
Area
acres Owner
75 Underwood Farms (1981)
36 Dennis White
100 Ontario Peninsula Farms Ltd
50 Ontario Peninsula Farms Ltd
25 Ontario Peninsula Farms Ltd
30 Glen McGillivray
45 Jack VanBaaren
45 Jack VanBaaren
55 Jack VanBaaren
50 Ontario Peninsula Farms
65 Ontario Peninsula Farms Ltd
38 Ontario Peninsula Farms Ltd
35 Claire Allen
38 Ontario Peninsula Farms Ltd
10 Ruth McLean
10 Jack Etherton
Municipality of Kincardine
(geographic Township of
Bruce)
Municipality of Kincardine
(geographic Township of
Bruce)
Municipality of Kincardine
(geographic Township of
Bruce)
Costs Percentage of
Benefit & Maintenance
Outlet Costs
By -Law # By -Law #
76 -4 76 -4
Jan -10 grant
dollars
as per
ADIP 2.3 c
(ii)
Costs $
Costs
(1/3 grant
applied if
applicable)
$1,023.64 5.05% $74.92 $24.97 $49.95
$903.41 4.46% $66.12 $22.04 $44.08
$1,633.95 8.07% $119.58 $39.86 $79.72
$1,018.50 5.03% $74.54 $24.85 $49.69
$509.25 2.51% $37.27 $12.42 $24.85
$877.44 4.33% $64.22 $21.41 $42.81
$597.58 2.95% $43.73 $14.58 $29.16
$937.46 4.63% $68.61 $22.87 $45.74
$1,561.15 7.71% $114.26 $38.09 $76.17
$1,248.41 6.16% $91.37 $30.46 $60.91
$942.02 4.65% $68.94 $22.98 $45.96
$979.98 4.84% $71.72 $23.91 $47.81
$672.35 3.32% $49.21 $16.40 $32.80
$729.98 3.60% $53.43 $17.81 $35.62
$13,635.12 67.33% $997.91 $332.64 $665.27
$258.60 1.28% $18.93 $18.93
$775.81 3.83% $56.78 $56.78
$1,034.41 5.11% $75.70 $75.70
$737.52 3.64% $53.98 $53.98
$76.35 0.38% $5.59 $5.59
$4,768.05 23.54% $348.95 $348.95
$5,581.92 27.56% $408.52 $408.52
$20,251.45 100.00% $1,482.14 $1,149.50
1/28/2010
2009 Drainage Super and Maint Grant forms & schedules
McDonald MD
Lot 20, Concession 10
Cleanout
Lot 25, Concession 10
N Tile Repair
U l k POPE. r ARDA
MAI N
ti ■
+ t
3 D.SNYDER
KEY PLAN
- SCALE: 1" 1320'
s
A. K
0
ot
NM INN
r sa
..,..__ ,
•
IR
r
XI
tops L. BRQ)r1