Loading...
HomeMy WebLinkAbout10 068 2010 McDonald Municipal Drain Maintenance By-Law• THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE BY -LAW NO. 2010 - 068 BEING A BY -LAW TO AUTHORIZE THE MAINTENANCE AND REPAIR OF A MUNICIPAL DRAIN UNDER THE PROVISIONS OF THE DRAINAGE ACT, R.S.O. 1990 (McDonald Municipal Drain) WHEREAS By -law 4 1976 (Township of Bruce) of The Corporation of the Municipality of Kincardine was passed by Council on December 21, 1975, providing for the construction of the McDonald Municipal Drain, being the current by -law; AND WHEREAS Council wishes to maintain and repair this Drain, without a new report of an Engineer, but in accordance with specifications outlined in the current Engineer's Report dated December 21, 1975 prepared by A.W. Clark Professional Engineers. as contained within the above - mentioned by -law; AND WHEREAS in accordance with section 74 of the Drainage Act, the cost of maintenance and repair of a Municipal Drain is to be at the expense of all the upstream lands and roads in any way assessed for the construction or improvement of the drainage works and in the proportion determined by the then current by -law pertaining thereto; AND WHEREAS the cost of this repair is $625.00; AND WHEREAS $94.07 is the amount to be contributed by this Municipality for repair of the municipal drain; NOW THEREFORE the Council of The Corporation of the Municipality of Kincardine ENACTS as follows: 1. That the McDonald Municipal Drain has been maintained and repaired to the specifications outlined in the Engineer's Report dated December 21, 1975 as prepared by A.W. Clark Professional Engineers and contained within the current by -law. 2. That the actual costs of this drainage repair and maintenance, attached hereto as Schedule 'A', be assessed as per the current by -law less any grant money received for lands eligible to receive agricultural grants. 3. That the amount of $448.02 necessary to be raised by this Municipality for such drainage works shall be made a cash assessment upon the roads and lands affected by the proposed work. All assessments are payable in the first year in which the assessment is imposed. .../2 • • • 4. For paying the amount of $94.07, being the amount assessed upon the lands and roads belonging to or controlled by the Municipality, a special rate sufficient to pay the amount assessed plus interest thereon shall be levied upon the whole ratable property in the Municipality of Kincardine after the passing of this by -law to be collected in the same manner and at the same time as other taxes are collected. 5. This by -law shall come into full force and effect upon its final passage. 6. This by -law may be cited as the "2010 McDonald Municipal Drain Maintenance By -law ". READ a FIRST and SECOND TIME this 19 day of May, 2010. Page 2 2010 McDonald Municipal Drain Maintenance By -Law By -Law No. 2010 - 068 READ a THIRD TIME and FINALLY PASSED this 19 day of May, 2010. ayor Clerk U Clerk r Repair Cost = Project Completion Date Conc. Lot Agricultural Lands Non - Agricultural Lands Roll # MAINTENANCE ASSESSMENT SCHEDULE MUNICIPALITY OF KINCARDINE (WARD III) McDONALD MUNICIPAL DRAIN - Tile Repair Lot 25, Concession 10 MAIN DRAIN - CLOSED PORTION $625.00 30- Nov -09 Costs Percentage of Jan -10 grant Benefit & Maintenance dollars Outlet Costs as per By -Law # By -Law # ADIP 2.3 c u ac Owner 76 - 4 76 - 4 Costs $ ) 1/27/2010 -1852275 Costs (1/3 grant applied if applicable) 10 25 4108 - 260- 003 - 04110 -0000 65 Ontario Peninsula Farms Ltd $2,534.01 43.79% $273.66 $91.22 $182.44 W 1/2 26 4108 - 260- 003 - 04200 -0000 38 Ontario Peninsula Farms Ltd $979.98 16.93% $105.83 $35.28 $70.55 E 1/2 26 4108 - 260- 003 - 04300 -0000 35 Claire Allen $672.35 11.62% $72.61 $24.20 $48.41 27 4108- 260- 003 - 04510 -0000 38 Ontario Peninsula Farms Ltd $729.98 12.61% $78.83 $26.28 $52.55 Total Assessment on Agricultural Lands $4,916.32 84.95% $530.93 $176.98 $353.95 Total Assessment on Non - Agricultural Lands $0.00 0.00% $0.00 $0.00 Roads Sideroad 25 Municipality of Kincardine $76.35 1.32% $8.25 $8.25 (geographic Township of Bruce) Concession 10 -11 Municipality of Kincardine $794.68 13.73% $85.82 $85.82 (geographic Township of Bruce) Total Assessment on Roads $871.03 15.05% $94.07 $94.07 Total Assessment on Lands and Roads $5.787.35 100.00% $625.00 $448.02 Repair Cost = Project Completion Date Conc. Lot Agricultural Lands 11 21 22 23 24 W 1/2 25 10 20 21 22 23 Pt. 24 25 W 1/2 26 E 1/2 26 27 Non - Agricultural Lands 11 E 1/2 25 10 Pt. 24 Sideroad 25 Concession 10 -11 Total Assessment on Roads MAINTENANCE ASSESSMENT SCHEDULE MUNICIPALITY OF KINCARDINE (WARD III) McDONALD MUNICIPAL DRAIN - Cleanout and Erosion Protection Lot 20, Concession 10 MAIN DRAIN - OPEN & CLOSED PORTIONS & "A" & "B" BRANCHES - CLOSED Roll # $1,482.14 20- Nov -09 4108 - 260 - 003 - 08500 -0000 4108- 260 - 003 - 08600 -0000 4108- 260- 003 - 08700 -0000 4108 - 260 - 003 - 08810 -0000 4108- 260- 003 - 08810 -0000 4108- 260- 003 - 03600 -0000 4108- 260- 003 - 03700 -0000 4108- 260 - 003 - 03900 -0000 4108- 260 - 003 - 03900 -0000 4108- 260- 003 - 04000 -0000 4108- 260 - 003 - 04110 -0000 4108- 260 - 003 - 04200 -0000 4108 - 260 - 003 - 04300 -0000 4108 - 260- 003 - 04510 -0000 Total Assessment on Agricultural Lands 4108 - 260 - 003 - 09000 -0000 4108 - 260- 003 - 04001 -0000 Total Assessment on Non - Agricultural Lands Roads Sideroad 20 Total Assessment on Lands and Roads Area acres Owner 75 Underwood Farms (1981) 36 Dennis White 100 Ontario Peninsula Farms Ltd 50 Ontario Peninsula Farms Ltd 25 Ontario Peninsula Farms Ltd 30 Glen McGillivray 45 Jack VanBaaren 45 Jack VanBaaren 55 Jack VanBaaren 50 Ontario Peninsula Farms 65 Ontario Peninsula Farms Ltd 38 Ontario Peninsula Farms Ltd 35 Claire Allen 38 Ontario Peninsula Farms Ltd 10 Ruth McLean 10 Jack Etherton Municipality of Kincardine (geographic Township of Bruce) Municipality of Kincardine (geographic Township of Bruce) Municipality of Kincardine (geographic Township of Bruce) Costs Percentage of Benefit & Maintenance Outlet Costs By -Law # By -Law # 76 -4 76 -4 Jan -10 grant dollars as per ADIP 2.3 c (ii) Costs $ Costs (1/3 grant applied if applicable) $1,023.64 5.05% $74.92 $24.97 $49.95 $903.41 4.46% $66.12 $22.04 $44.08 $1,633.95 8.07% $119.58 $39.86 $79.72 $1,018.50 5.03% $74.54 $24.85 $49.69 $509.25 2.51% $37.27 $12.42 $24.85 $877.44 4.33% $64.22 $21.41 $42.81 $597.58 2.95% $43.73 $14.58 $29.16 $937.46 4.63% $68.61 $22.87 $45.74 $1,561.15 7.71% $114.26 $38.09 $76.17 $1,248.41 6.16% $91.37 $30.46 $60.91 $942.02 4.65% $68.94 $22.98 $45.96 $979.98 4.84% $71.72 $23.91 $47.81 $672.35 3.32% $49.21 $16.40 $32.80 $729.98 3.60% $53.43 $17.81 $35.62 $13,635.12 67.33% $997.91 $332.64 $665.27 $258.60 1.28% $18.93 $18.93 $775.81 3.83% $56.78 $56.78 $1,034.41 5.11% $75.70 $75.70 $737.52 3.64% $53.98 $53.98 $76.35 0.38% $5.59 $5.59 $4,768.05 23.54% $348.95 $348.95 $5,581.92 27.56% $408.52 $408.52 $20,251.45 100.00% $1,482.14 $1,149.50 1/28/2010 2009 Drainage Super and Maint Grant forms & schedules McDonald MD Lot 20, Concession 10 Cleanout Lot 25, Concession 10 N Tile Repair U l k POPE. r ARDA MAI N ti ■ + t 3 D.SNYDER KEY PLAN - SCALE: 1" 1320' s A. K 0 ot NM INN r sa ..,..__ , • IR r XI tops L. BRQ)r1