HomeMy WebLinkAbout08 061 2008 Russel Municipal Drain Maintenance
.
.
.
.
THE CORPORATION OF THE MUNICIPALITY OF KINCARDINE
BY-LAW
NO. 2008 - 061
BEING A BY-LAW TO AUTHORIZE THE MAINTENANCE AND REPAIR
OF A MUNICIPAL DRAIN UNDER THE PROVISIONS OF THE
DRAINAGE ACT, R.S.0.1990
(Russell Municipal Drain)
WHEREAS By-law No. 90-22 of The Corporation of the Municipality of
Kincardine was passed by Council on November 19, 1990, providing for the
construction of the Russeil Municipal Drain, being the current by-law;
AND WHEREAS Council has repaired this Drain, without a new report of an
Engineer, but in accordance with specifications outlined in the current Engineer's
Report dated September 10, 1990 prepared by Paragon Engineering Limited, as
contained within the above-mentioned by-law;
AND WHEREAS in accordance with section 74 of the Drainage Act, the cost of
maintenance and repair of a Municipal Drain is to be at the expense of ail the
upstream lands and roads in any way assessed for the construction or
improvement of the drainage works and in the proportion determined by the then
current by-law pertaining thereto EXCEPT THAT, in this case, in accordance with
Section 80 of the Act, Parts of Lots 39 and 40, bearing the Roil Number 4108 210
004 302, shail be assessed a special amount for the repairs to the Main Drain
Closed portion of the Drain;
AND WHEREAS the work done on the Main Drain Closed portion included tile
repairs, tile inspection and cutting of the grassed waterway, at a cost of
$7,967.97;
AND WHEREAS the work done on Branch 0 included catch basin and tile
repairs, at a cost of $1,180.76;
AND WHEREAS the work done on Branch F included a number of tile repairs, at
a cost of $1 ,038.28;
AND WHEREAS the total cost of the above-noted repairs is $10,187.01;
AND WHEREAS $614.92 is the amount to be contributed by this Municipality for
the maintenance and repair of the various parts of the municipal drain;
NOW THEREFORE the Council of The Corporation of the Municipaiity of
Kincardine, ENACTS as foilows;
1.
That the Russeil Municipal Drain has been maintained and repaired to the
specifications outlined in the Engineer's Report dated September 10,
1990, as prepared by Paragon Engineering Limited and contained within
the current by-law.
.../2
.
.
.
.
Page 2
2008 Russell Municipal Drain Maintenance By-law
By-law No. 2008 - 061
2.
That the actual costs of this drainage repair and maintenance, attached
hereto as Schedule 'A', be assessed as per the current by-law, EXCEPT
THAT, in this case, In accordance with Section 80 of the Act Parts of Lots
39 and 40, nearing the Roll Number 4108 210 004 302, shall be assessed
a special amount for the repairs to the Main Drain Closed portion of the
Drain, less any grant money received for lands eligible to receive
agricultural grants.
3. That the amount of $10,187.01 necessary to be raised by this Municipaiity
for such drainage works shall be made a cash assessment upon the roads
and lands affected by the proposed work. All assessments are payable in
the first year in which the assessment is imposed.
4.
For paying the amount of $614.92 being the amount assessed upon the
lands and roads belonging to, or controlled by the municipaiity a special
rate sufficient to pay the amount assessed plus interest thereon shall be
levied upon the whole ratable property in the Municipality of Kincardine
after the passing of this by-law to be collected in the same manner and at
the same time as other taxes are collected.
5. This by-law shall come into full force and effect upon its final passage.
6. This by-law may be cited as the "2008 Russell Municipal Drain
Maintenance By-law".
READ a FIRST and SECOND TIME this 16'h day of April, 2008.
cic1-oy~
Mayor
i*-~~
Clerk
READ a THIRD TIME and FINALLY PASSED this 16'h, day of April, 2008.
~(P~
~ ~~o.QQ
Clerk
This is Schedule ::..it" to By-Law
='!!- lIih
No. Nol passedthe~day
of 200li"
MAINTENANCE ASSESSMENT SCHEDULE
RUSSELL MUNICIPAL DRAIN
MAIN DRAIN. CLOSED PORTION
Clerk
-----
General assessment
Special assessment
$5,798.98
$2.168.99
Cone.
If Actual Repair Cost =
$7 967 97
Lot
Owner
Agricultural Lands
A
A
A
A
A
A
A
6
6
7
7
pt E Pt 38,39
pt E Pt 38,39
C pt 38,39,40
E Pt39,40
C Pt41,42
E Pt41,42
E Pt43
PI1
Pt1,2
S Pt 1
N Pt1
H.J. Seiber Farms
H.J. Seiber Farms
H.J. Seiber Farms
Burton Irwin Slade
Bonnie Jane Slade
Burton Ilwin Slade
Irwin Slade
Henry Edward Voskamp
Burton Irwin Slade
Burton Irwin Slade
Joan Viola Storey
Total Assessment on Agricultural Lands
Non-Agricultural lands
A
A
6
Pt E Pt43
pt E pt 38,39
PI1
Sidney David Brown
Dianne Farrell
Hydro One Networks Inc.
Roads
Total Assessment on Non-Agricultural Lands
l Highway No. 21
Cone
Road 7
Min. of Transportation
Mun. of Kincardine
Total Assessment on Roads
A
ptE Pt38,39
H.J. SeIber Farms
Total Assessment for Maintenance on
Lands and Roads for Main Drain - Closed Portion
Jan 28/08
Regular
%
$
6.72 389.69 yes 259.81
1845.63 yes 1230.48
10.36 600.77 yes 400.54
6.34 367.66 yes 245.12
1.53 88.72 yes 59.15
6.82 395.49 yes 263.67
1.42 82.35 yes 54.90
10.56 612.37 yes 408.27
30.53 1770.43 yes 1180.34
9.82 569.46 yes 379.66
0.96 55.67 yes 37.12
85.06 6778.24 2259.19 4519.05
0.12
0.21
2.66
6.96
12.18
154.25
no
no
no
6.96
12.18
154.25
2.99
173.39
173.39
6.54 379.25 no 379.25
5.41 313.72 no 313.72
11.95 692.98 692.98
323.36 323.36
100.00 7967.97 5708.78
18/04/2008
Russell Mun. Drain Schedule
MAINTENANCE ASSESSMENT SCHEDULE
RUSSELL MUNICIPAL DRAIN
BRANCH D (CLOSED)
IIActuaJ Repair Cost =
Cone.
Lot
Agricultural lands
6
7
7
Pt1
SPt1
N Pt 1
Total Assessment on Agricultural Lands
Roads
King's Highway No. 21
Conc.Rd
7
Total Assessment on Roads
Total Assessment for Maintenance on
Lands and Roads for Branch D
$1,180.76
Owner
Henry Edward Voskamp
Burton IIwin Slade
Joan Viola Storey
Min. of Transportation
Municipality of Kincardine
Regular
%
3.63
41.11
4.03
Jan-07
$
42.86
485.41
47.58
48.77
575.86
34.11
17.12
402.76
202.15
51.23 604.90
100.00 1180.76
yes
yes
yes
191.95
no
no
28.57
323.61
31.72
383.90
402.76
202.15
604.90
988.81
18/0412008
Russell Mun. Drain Schedule
MAINTENANCE ASSESSMENT SCHEDULE
RUSSELL MUNICIPAL DRAIN
BRANCH F (CLOSED)
IIActual Repair Cost =
$1,038.28
Jan-{)7
Cone.
Lot
Owner
Regular
%
$
Agricultural Lands
A
A
A
c Pt 38,39,40
E Pt 39,40
E Pt41,42
H.J.Seiber Farms
Burton Irwin Slade
Burton Irwin Slade
34.71
23.16
23.32
360.39
240.47
242.13
yes
yes
yes
240.26
160.31
161.42
Total Assessment on Agricultural Lands
81.19
842.98
280.99
561.99
Roads
King's Highway No. 21 Min. of Transportation 9.27 96.25 00 96.25
Conc.Rd 9.54 99.05 99.05
7 Municipality of Kincardine 00
Total Assessment on Roads 18.81 195.30 195.30
Total Assessment for Maintenance on
Lands and Roads for Branch F 100.00 1038.28 757.29
18/04/2008
Russell Mun. Drain Schedule