Loading...
HomeMy WebLinkAboutKIN 93 075 Amend Cons Fee . . THE CORPORATION OF THE TOWN OF KINCARDINE .....'"....... BY-LAW BY-LAW NO. 1993-75 A BY-LAW TO AMEND THE CONSOLIDATED FEE BY-LAW FOR THE TOWN OF KINCARDINE WHEREAS the Council for The Corporation of the Town of Kincardine deems it advisable to amend the Consolidated Fee By-law; NOW THEREFORE the Council for The Corporation of the Town of Kincardine ENACTS as follows: 1. That Schedule "A" to By-law No. 1993-24 be amended replaced with Schedule "A" to this by-law. 2. This by-law shall come into full force and effect upon the date of final passage. 3 . This by-law may be cited as the "Consolidated Fee Amendment By-law, December 1993". READ a FIRST, SECOND and THIRD time and FINALLY PASSED this 16th day of December, 1993. ~~~ Mayor ~~ Clerk BY-LAW NO. 1993-75 SCHEDULE "An Consolidated Fee By-law No. 1989-118 as amended by by-laws 1990-18, 1990-26, 1991-18, 1992-15, 1992-37, and 1992-64, 1992-103, and 1993-07, .:~d ::::::':'::dL:::::::~ (BYe'aw No. 19B9-120) (no G.S.T.I Item Fee Grade 1 - for a public hall having a licensed capacity of 1,000 persons or over ................... $ 65.00 Grade 2 - for a public hall having a licensed capacity between 601 and 999 persons ................ Grade 3 - for a public hall having a licensed capacity between 60 and 600 persons ................. Transfer of public hall license to new owner ......... $ 55.00 $ 45.00 $ 12.00 B. TAX CERTIFICATES (Bv-Iaw No. 1990-20) (no G.S.T.) charge per tax certificate ........................... $ 18.00 C. RENTAL - TOWN HALL AND ANNEX (plus G.S.T. ) Council Chambers No admission charged: Full day .................. . $ 35.00 Half-day or evening ....... . $ 25.00 Admission charged: Full day .................. . $ 45.00 Half-day or evening ....... . $ 35.00 Committee Room No admission charged: Full day .................. . $ 20.00 Half-day or evening ....... . $ 10.00 Admission charged: Full day .................. . $ 30.00 Half-day or evening ....... . $ 20.00 Auditorium No admission charged: Full day .................. . $ 45.00 Half-day or evening ....... . $ 40.00 Admission charged: Full day .................. . $ 65.00 Half-day or evening ....... . $ 55.00 Town Hall Annex - 3rd Floor Each office Full day .................. . $ 22.50 Half-day or evening ....... . $ 12.50 . .. ./2 -2- D. LOTTERY. RAFFLE AND BINGO LICENSE FEES (no G.S.T.) Charitable, non-profit events and community interest groups: . Bingo license ......................... 1 per cent (1%) of prize package for each bingo Raffles ............................... 3 J?er cent (3%) of pr1ze value for each raffle Break-open tickets ................... 3 per cent of prize value of each box E. BUILDING PERMIT FEES (Bv-law No. 1990-25) (no G.S.T. unless noted) 1. (a) New buildings (greater than 10 square metres) ..................................... $. 32/sq. ft. (b) New Buildings (greater than 10 square metres) that will have finished basements shall pay an additional surcharge for each square foot of basement area................................. $ .10/sq. ft. (c) New accessory buildings (greater than 10 square metres) ......... ... ...... ........ ..$.20/sq.ft. 2. (a) Additions to existing buildings ................... .. $.20/sq.ft. (b) Additions to existing accessory buildings ...... .. $.20/sq.ft. with min. fee $40. 3. Alterations, addition and repairs to existing buildings ........................................ $5/$1000 of est. cost of const. with min. fee $40. 4. Demolition of a building or portion thereof ...... $ 40.00 5. Moving permits for buildings ..................... $ 40.00 6. All new and additions to farm buildings exclusive of dwellings ........................... $.15/sq.ft. with min. fee $40. . 7. Swimming pools (above- or in-ground) ............. $ 40.00 8. Change of occupancy permit ....................... $ 40.00 (inspection of building in which occupancy (plus G.S.T.) is changed to more hazardous, refer to Code Sec. 3.2.9) 9 . Renewal permits .................................. Same as (2) above 10. Occupancy permits ................................ $ 40.00 (Section 2.7.1 and 2.7.2 of the regulations, (plus G.S.T.) refers to occupancy of partially completed buildings other than single family dwellings) 11. Reinsulation of existing building ................ $ 40.00 (if requested) ../3 -3- . 12. Building Deposit a)Buildings with up to 3 units.......................$1500.00 b)Buildings with more than three units in 1 structure $500.00/unit c)project with more than one building.....$1500 each for first three, $500 for each additional building 13. Chimneys and fireplaces .......................... $ 40.00 14. Sign permit ...................................... $ 40.00 (those signs regulated by section 3.7 of the Code and the Town of Kincardine sign by-law) 15. Miscellaneous inspections ........................ $ 40.00 16. Zoning compliance certificate .................... $ 40.00 plus GST F. ADMINISTRATION FEES (plus G.S.T. except nos. 5 and 6) 1. commissioning of oaths ........................... $ 3.00 2. certification of photocopies ..................... $ 3.00 (plus cost of photocopy) 3. Swearing an affadavit: (i) if affadavit already prepared (ii) if affadavit prepared by Town ................................ $ $ 3.00 7.50 .............................. .. 4. Preparation of document generals ................. $ 50.00 5. site Plan application fees ....................... $ 150.00 Updates requiring Council approval............... $ 50.00 6. Application for Part Lot Control.................. 7. Photocopies ...................,.,.,........,.,........ ., $ 50.00 per lot $ .50 per copy $ 50.00 per agreement 8. Encroachment agreement processing ................ G. LANDFILL SITE FEES (Bv-Iaw No. 1990-24) (no G.S.T.) Kincardine residents only: 1 . Minimum Charge .................................... $ 7. 50 2. All refuse (commercial or residential)...............$70/ton 3. Tire Deposit fees: . Automobile tires ................................. $ Automobile tires on rim .......................... Truck tires ...................................... Truck tires on rim ............................... Tractor tires .................................... 3.00 5.00 10.00 15.00 20.00 4. Bag Tag.....,.....,.,..........,.........,.,............ 2.00 * Leaves and organic matter will continue to be accepted at the Valentine Avenue Landfill site free of charge. .. ./4 -4- H. PLUMBING INSPECTION FEES (By-law No. 1991-23) (no G.S.T.) 1. Exclusive of a building drain and a building- sewer ........................................................................................ $ 22.. 00 plus $2.50 per fixture unit . 2. Inspection of a building sewer: For the first 100 feet ........................... For each 100 feet thereafter ..................... 3. Inspection of a building drain ................... 4. Inspection of a sewer connection ................. 5. Inspection fee for sewage injectors .............. 6. Alterations to plumbing without addition of fixtures, inspection fee ......................... 7. Inspection of factory-built home ................. 8. When plumbing inspector notified that any plumbing is ready for inspection and the same is not ready when the plumbing inspector intends to inspect the same or if the plumbing fails to conform to any requirements to which the same is bound to conform, an addition fee of $20.00 for each additional inspection or visit by the plumbing inspector will be required. $ 3.00 $ 2.00 $ 3.00 $ 27.00 Equal to three fixture units $ 5.00 Basic fee plus 22.00 plus fixture fees if applicable I. CONNAUGHT PARK TOURNAMENT FEES (plus G.S.T.) 1. payable by all groups wishing to hold a ball tournament at Connaught Park, with the exception of those groups which pay an annual user fee to the Town of Kincardine. Evenings .................................................................................. $ 50.. 00 Full day .................................................................................. $ 100.. 00 J. DOG LICENSING AND KENNEL BOARDING FEES (Bv law 1991-16) (no G.S.T. except no. 7) 1. For the first spayed female dog or neutered male dog with certificate of verification ............. $ For the first female dog not spayed or each male dog,n?t n~utered, or without a certificate of ver~flcatlon .......................................................................... $ 2. . 3. For second dog (spayed, neutered, non-spayed, or non-neutered) ................................. Basic fee 12.00 Basic fee 25.00 $ Basic fee plus 15.00 " ./5 -5- J. DOG LICENSING AND KENNEL FEES (cont'd) (no G.S.T. except No.7) . 5. 6. 7. 8. 4. For third dog (spayed, neutered, non-spayed, or non-neutered) ................................... Basic fee plus 20.00 $ Kennel license ................................................. $ 75.00 License tag fee .................................. $ 2.00 Boarding fees for all animals impounded (dogs or cats), per day................................... $ 15.00 (plus GST) Provided that where the owner acquired the dog after expiration of 6 months of the year, the license fee charge (excluding the tag charge) shall be one-half of the fee noted above. 9. Voluntary out-of-court penalty payments: (a) dogs running at large ........................ $ (b) dogs running at large without license ........ $ (c) dogs without license ......................... $ (d) failing to remove dog waste .................. $ 10. Cat identification tags (each) ................... $ 30.00 40.00 30.00 40.00 2.00 K. ROTARY PARK BOAT DOCK FEES (plus G.S.T.) Seasonal rate, per slip .............................. $ 450.00 Daily rate, per slip ................................. $ 7.00 L. MECHANIC LABOUR RATE (no G.S.T.) Charge per hour ...................................... $ 26.50 M. SANITARY SEWER SERVICE CHARGE (no G.S.T.) .. 1. Residential: Per residential unit, per year ................... $ 110.00 2. Commercial: Per commercial building, per year ................ 80% of metered water charge for prev- ious year 3. Industrial sewage in excess of 30.4 m3/month......$.50/m3 SALE OF LOTS - KINCARDINE INDUSTRIAL PARK (plus G.S.T.) Per hectare .......................................... $ 60,000. O. HAWKERS AND PEDLARS LICENSE FEE (By-law 1992-38) (no G.S.T.) Per license ............................................................... $ 500.. .. ./6 -6- P. CEMETERY RATES (By-law No. 1992- ) (plus G.S.T.) RateDayers: Single grave (adult) - Land .......................... $ 162.50 - Perpetual care ................ 150.00 . Single grave (infant) - Land ......................... - Perpetual care ............... Non-RateDayers: Single grave (adult) - Land .......................... - Perpetual care ................ single grave (infant) - Land ......................... - Perpetual care ............... RateDayerS and Non-rateDavers: 65.00 50.00 182.00 150.00 71.50 50.00 Transfer of ownership ................................ 5.00 Issuance of replacement deed ......................... 5.00 Interment - adult.................................... - infant (up to five years) ................ - cremated remains ......................... - license fee contribution ................. Additional charge for Saturday, Sunday and holidays - cremated remains ......................... - adult and infant interments .............. Installation of concrete foundations ................. Monument Maintenance Rates: Flat monument ........................................ 4 feet in height and under ........................... Over 4 feet in height ................................ storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Q. HARBOUR DOCKAGE FEES (plus G.S.T.) 1. a) b) c) . 2. a) Non-commercial Vessels: 295.00 90.00 80.00 10.00 125.00 225.00 9.00 per cubic foot 50.00 100.00 150.00 35.00 Duration of one month or greater: Per vessel foot, per month ....................... 4.46 Duration of three months or greater: Same as above, less 10% if paid in advance Less than one month duration: Per vessel foot, per day ......................... .32 Commercial Fishincr Vessels: Seasonal rate (three months and over): Per 100 feet of dockage ........................... $ 200.00 .. ./7 · .U. -7- R. SEWER CONNECTION CHARGES: (G.S.T. only on passed-on costs) All costs to be paid in advance of the work. 1. No sewer main in front of property: a) Capital contribution: - single and semi-detached (each) ............... 2,030.96 - multiple dwellings (each) ......................1,506.83 - apartments (each) .............................. 1,113 . 74 - commercial establishments ......................2,030.96 Refer to development charges by-law for definitions. b) Sewer main, lateral and connection charge: Property owner to pay the Town's cost to install from the sewer main to the property line, plus administration and inspection charges. property owner is responsible for the installation and costs related to the connection from the property line to the building. lateral 10% for 2. Sewer main already in front of property: a) Capital contribution: No charge if frontage charge has been paid at the time of the original sewer project. If frontage charges have never been paid, costs would be the same as 1 (a) above. b) Lateral and connection charge: Same as 1 (b) above. S. PAYMENT IN LIEU OF PARKING (No G.S.T.) a) All qualifying Cl zoned properties ........................ .. $ 1. 00 per space b) C1 properties where building has been altered to increase square footage of building used for commercial purposes, or use changes from residential to commercial. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. $1,500 per space c) Non-qualifying Cl zoned properties...............$l,500 per space d) All other commercially zoned properties must provide physical parking spaces. T. REFRESHMENT VEHICLE LICENSES (No G.S.T.)(By-Iaw No.1993-6) a) License fee for each vehicle ........................................ $ 275.00 b) For each additional vehicle up to three. . . . . . . . . . $ 275.00 c) For the fourth and any sUbsequent vehicles.......$ 55.00 ROAD CUT PERMIT a) Each permit..........................................$ 50.00