HomeMy WebLinkAboutKIN 93 075 Amend Cons Fee
.
.
THE CORPORATION OF THE TOWN OF KINCARDINE
.....'".......
BY-LAW
BY-LAW NO. 1993-75
A BY-LAW TO AMEND THE CONSOLIDATED FEE BY-LAW FOR THE TOWN
OF KINCARDINE
WHEREAS the Council for The Corporation of the Town of
Kincardine deems it advisable to amend the Consolidated Fee
By-law;
NOW THEREFORE the Council for The Corporation of the Town
of Kincardine ENACTS as follows:
1. That Schedule "A" to By-law No. 1993-24 be amended
replaced with Schedule "A" to this by-law.
2. This by-law shall come into full force and effect upon
the date of final passage.
3 . This by-law may be cited as the "Consolidated Fee
Amendment By-law, December 1993".
READ a FIRST, SECOND and THIRD time and FINALLY PASSED this 16th
day of December, 1993.
~~~
Mayor
~~
Clerk
BY-LAW NO. 1993-75
SCHEDULE "An
Consolidated Fee By-law No. 1989-118 as amended by by-laws 1990-18,
1990-26, 1991-18, 1992-15, 1992-37, and 1992-64, 1992-103, and 1993-07,
.:~d ::::::':'::dL:::::::~ (BYe'aw No. 19B9-120) (no G.S.T.I
Item Fee
Grade 1 - for a public hall having a licensed capacity
of 1,000 persons or over ................... $ 65.00
Grade 2 - for a public hall having a licensed capacity
between 601 and 999 persons ................
Grade 3 - for a public hall having a licensed capacity
between 60 and 600 persons .................
Transfer of public hall license to new owner .........
$ 55.00
$ 45.00
$ 12.00
B. TAX CERTIFICATES (Bv-Iaw No. 1990-20) (no G.S.T.)
charge per tax certificate ........................... $ 18.00
C. RENTAL - TOWN HALL AND ANNEX (plus G.S.T. )
Council Chambers
No admission charged: Full day .................. . $ 35.00
Half-day or evening ....... . $ 25.00
Admission charged: Full day .................. . $ 45.00
Half-day or evening ....... . $ 35.00
Committee Room
No admission charged: Full day .................. . $ 20.00
Half-day or evening ....... . $ 10.00
Admission charged: Full day .................. . $ 30.00
Half-day or evening ....... . $ 20.00
Auditorium
No admission charged: Full day .................. . $ 45.00
Half-day or evening ....... . $ 40.00
Admission charged: Full day .................. . $ 65.00
Half-day or evening ....... . $ 55.00
Town Hall Annex - 3rd Floor
Each office Full day .................. . $ 22.50
Half-day or evening ....... . $ 12.50
.
.. ./2
-2-
D. LOTTERY. RAFFLE AND BINGO LICENSE FEES (no G.S.T.)
Charitable, non-profit events and community interest groups:
.
Bingo license ......................... 1 per cent (1%) of
prize package for each
bingo
Raffles ............................... 3 J?er cent (3%) of
pr1ze value for each
raffle
Break-open tickets ................... 3 per cent of prize value
of each box
E. BUILDING PERMIT FEES (Bv-law No. 1990-25) (no G.S.T. unless noted)
1. (a) New buildings (greater than 10 square
metres) ..................................... $. 32/sq. ft.
(b) New Buildings (greater than 10 square
metres) that will have finished
basements shall pay an additional
surcharge for each square foot of
basement area................................. $ .10/sq. ft.
(c) New accessory buildings (greater than
10 square metres) ......... ... ...... ........ ..$.20/sq.ft.
2. (a) Additions to existing buildings ................... .. $.20/sq.ft.
(b) Additions to existing accessory buildings ...... .. $.20/sq.ft.
with min.
fee $40.
3. Alterations, addition and repairs to existing
buildings ........................................ $5/$1000
of est.
cost of
const.
with min.
fee $40.
4. Demolition of a building or portion thereof ...... $ 40.00
5. Moving permits for buildings ..................... $ 40.00
6. All new and additions to farm buildings
exclusive of dwellings ........................... $.15/sq.ft.
with min.
fee $40.
.
7. Swimming pools (above- or in-ground) ............. $ 40.00
8. Change of occupancy permit ....................... $ 40.00
(inspection of building in which occupancy (plus G.S.T.)
is changed to more hazardous, refer to Code
Sec. 3.2.9)
9 . Renewal permits .................................. Same as (2)
above
10. Occupancy permits ................................ $ 40.00
(Section 2.7.1 and 2.7.2 of the regulations, (plus G.S.T.)
refers to occupancy of partially completed
buildings other than single family dwellings)
11. Reinsulation of existing building ................ $ 40.00
(if requested)
../3
-3-
.
12. Building Deposit
a)Buildings with up to 3 units.......................$1500.00
b)Buildings with more than three units in 1 structure
$500.00/unit
c)project with more than one building.....$1500 each for
first three, $500 for
each additional building
13. Chimneys and fireplaces .......................... $ 40.00
14. Sign permit ...................................... $ 40.00
(those signs regulated by section 3.7 of the
Code and the Town of Kincardine sign by-law)
15. Miscellaneous inspections ........................ $ 40.00
16. Zoning compliance certificate .................... $ 40.00
plus GST
F. ADMINISTRATION FEES (plus G.S.T. except nos. 5 and 6)
1. commissioning of oaths ........................... $ 3.00
2. certification of photocopies ..................... $ 3.00
(plus cost of photocopy)
3. Swearing an affadavit:
(i) if affadavit already prepared
(ii) if affadavit prepared by Town
................................ $
$
3.00
7.50
.............................. ..
4. Preparation of document generals ................. $ 50.00
5. site Plan application fees ....................... $ 150.00
Updates requiring Council approval............... $ 50.00
6. Application for Part Lot Control..................
7.
Photocopies
...................,.,.,........,.,........ .,
$ 50.00
per lot
$ .50
per copy
$ 50.00
per
agreement
8. Encroachment agreement processing ................
G. LANDFILL SITE FEES (Bv-Iaw No. 1990-24) (no G.S.T.)
Kincardine residents only:
1 . Minimum Charge .................................... $ 7. 50
2. All refuse (commercial or residential)...............$70/ton
3. Tire Deposit fees:
.
Automobile tires ................................. $
Automobile tires on rim ..........................
Truck tires ......................................
Truck tires on rim ...............................
Tractor tires ....................................
3.00
5.00
10.00
15.00
20.00
4.
Bag Tag.....,.....,.,..........,.........,.,............
2.00
* Leaves and organic matter will continue to be accepted at the
Valentine Avenue Landfill site free of charge.
.. ./4
-4-
H. PLUMBING INSPECTION FEES (By-law No. 1991-23) (no G.S.T.)
1. Exclusive of a building drain and a building-
sewer ........................................................................................ $ 22.. 00
plus $2.50
per
fixture
unit
.
2. Inspection of a building sewer:
For the first 100 feet ...........................
For each 100 feet thereafter .....................
3. Inspection of a building drain ...................
4. Inspection of a sewer connection .................
5. Inspection fee for sewage injectors ..............
6. Alterations to plumbing without addition of
fixtures, inspection fee .........................
7. Inspection of factory-built home .................
8. When plumbing inspector notified that any plumbing is
ready for inspection and the same is not ready when the
plumbing inspector intends to inspect the same or if
the plumbing fails to conform to any requirements to
which the same is bound to conform, an addition fee of
$20.00 for each additional inspection or visit by the
plumbing inspector will be required.
$ 3.00
$ 2.00
$ 3.00
$ 27.00
Equal to
three
fixture
units
$ 5.00
Basic fee
plus 22.00
plus
fixture
fees if
applicable
I. CONNAUGHT PARK TOURNAMENT FEES (plus G.S.T.)
1. payable by all groups wishing to hold a ball tournament
at Connaught Park, with the exception of those groups
which pay an annual user fee to the Town of Kincardine.
Evenings .................................................................................. $ 50.. 00
Full day .................................................................................. $ 100.. 00
J. DOG LICENSING AND KENNEL BOARDING FEES (Bv law 1991-16)
(no G.S.T. except no. 7)
1.
For the first spayed female dog or neutered male
dog with certificate of verification ............. $
For the first female dog not spayed or each male
dog,n?t n~utered, or without a certificate of
ver~flcatlon .......................................................................... $
2.
.
3.
For second dog (spayed, neutered, non-spayed,
or non-neutered) .................................
Basic
fee
12.00
Basic
fee
25.00
$
Basic
fee
plus
15.00
" ./5
-5-
J. DOG LICENSING AND KENNEL FEES (cont'd) (no G.S.T. except No.7)
. 5.
6.
7.
8.
4.
For third dog (spayed, neutered, non-spayed,
or non-neutered) ...................................
Basic
fee
plus
20.00
$
Kennel license ................................................. $
75.00
License tag fee .................................. $ 2.00
Boarding fees for all animals impounded (dogs or
cats), per day................................... $ 15.00
(plus GST)
Provided that where the owner acquired the dog
after expiration of 6 months of the year, the
license fee charge (excluding the tag charge)
shall be one-half of the fee noted above.
9. Voluntary out-of-court penalty payments:
(a) dogs running at large ........................ $
(b) dogs running at large without license ........ $
(c) dogs without license ......................... $
(d) failing to remove dog waste .................. $
10. Cat identification tags (each) ................... $
30.00
40.00
30.00
40.00
2.00
K. ROTARY PARK BOAT DOCK FEES (plus G.S.T.)
Seasonal rate, per slip .............................. $ 450.00
Daily rate, per slip ................................. $ 7.00
L. MECHANIC LABOUR RATE (no G.S.T.)
Charge per hour ...................................... $ 26.50
M. SANITARY SEWER SERVICE CHARGE (no G.S.T.)
..
1. Residential:
Per residential unit, per year ................... $ 110.00
2. Commercial:
Per commercial building, per year ................ 80% of
metered
water
charge
for prev-
ious year
3. Industrial sewage in excess of 30.4 m3/month......$.50/m3
SALE OF LOTS - KINCARDINE INDUSTRIAL PARK (plus G.S.T.)
Per hectare .......................................... $ 60,000.
O. HAWKERS AND PEDLARS LICENSE FEE (By-law 1992-38) (no G.S.T.)
Per license ............................................................... $ 500..
.. ./6
-6-
P. CEMETERY RATES (By-law No. 1992-
) (plus G.S.T.)
RateDayers:
Single grave (adult) - Land .......................... $ 162.50
- Perpetual care ................ 150.00
.
Single grave (infant) - Land .........................
- Perpetual care ...............
Non-RateDayers:
Single grave (adult) - Land ..........................
- Perpetual care ................
single grave (infant) - Land .........................
- Perpetual care ...............
RateDayerS and Non-rateDavers:
65.00
50.00
182.00
150.00
71.50
50.00
Transfer of ownership ................................ 5.00
Issuance of replacement deed ......................... 5.00
Interment - adult....................................
- infant (up to five years) ................
- cremated remains .........................
- license fee contribution .................
Additional charge for Saturday, Sunday and holidays
- cremated remains .........................
- adult and infant interments ..............
Installation of concrete foundations .................
Monument Maintenance Rates:
Flat monument ........................................
4 feet in height and under ...........................
Over 4 feet in height ................................
storage. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Q. HARBOUR DOCKAGE FEES (plus G.S.T.)
1.
a)
b)
c)
. 2.
a)
Non-commercial Vessels:
295.00
90.00
80.00
10.00
125.00
225.00
9.00
per cubic
foot
50.00
100.00
150.00
35.00
Duration of one month or greater:
Per vessel foot, per month ....................... 4.46
Duration of three months or greater:
Same as above, less 10% if paid in advance
Less than one month duration:
Per vessel foot, per day ......................... .32
Commercial Fishincr Vessels:
Seasonal rate (three months and over):
Per 100 feet of dockage ........................... $ 200.00
.. ./7
·
.U.
-7-
R. SEWER CONNECTION CHARGES: (G.S.T. only on passed-on costs)
All costs to be paid in advance of the work.
1. No sewer main in front of property:
a)
Capital contribution:
- single and semi-detached (each) ............... 2,030.96
- multiple dwellings (each) ......................1,506.83
- apartments (each) .............................. 1,113 . 74
- commercial establishments ......................2,030.96
Refer to development charges by-law for definitions.
b) Sewer main, lateral and connection charge:
Property owner to pay the Town's cost to install
from the sewer main to the property line, plus
administration and inspection charges.
property owner is responsible for the installation and
costs related to the connection from the property line to
the building.
lateral
10% for
2. Sewer main already in front of property:
a) Capital contribution:
No charge if frontage charge has been paid at the time
of the original sewer project.
If frontage charges have never been paid, costs would
be the same as 1 (a) above.
b) Lateral and connection charge:
Same as 1 (b) above.
S. PAYMENT IN LIEU OF PARKING (No G.S.T.)
a)
All qualifying Cl zoned properties
........................ ..
$ 1. 00
per space
b) C1 properties where building has been altered to
increase square footage of building used for commercial
purposes, or use changes from residential to
commercial. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. $1,500
per space
c) Non-qualifying Cl zoned properties...............$l,500
per space
d) All other commercially zoned properties must provide
physical parking spaces.
T.
REFRESHMENT VEHICLE LICENSES (No G.S.T.)(By-Iaw No.1993-6)
a) License fee for each vehicle ........................................ $ 275.00
b) For each additional vehicle up to three. . . . . . . . . . $ 275.00
c) For the fourth and any sUbsequent vehicles.......$ 55.00
ROAD CUT PERMIT
a) Each permit..........................................$ 50.00