Loading...
HomeMy WebLinkAbout02 146 td eng consult watermain e e e e TIlE CORPORATION OF THE MUNICIPALITY OF KINCARDINE BY-LAW NO. 2002 - 146 BEING A BY-LAW TO ACCEPT A TENDER FOR AN ENGINEERING CONSULTANT TO DESIGN AND CONSTRUCT THE TRUNK WATERMAIN (B.M. Ross & Associates Ltd.) WHEREAS the Council for The Corporation of the Municipality of Kincardine deems it expedient to accept a tender for an Engineering Consultant to design and construct the trunk watermain identified as the preferred alternative in the Shorelinerriverton water supply environmental assessment. NOW THEREFORE the Council for The Corporation of the Municipality of Kincardine ENACTS as follows: 1. That the low tender of B.M. Ross & Associates Ltd. in the amount of $138,190.00 excluding GST taxes. Plus the estimated cost of design for subdivision watermains at $5,100.00 per kilometer excluding GST taxes, be hereby accepted. 2. That the Mayor and CAO be hereby authorized to sign, on behalf of the Council for The Corporation of the Municipality of Kincardine any contracts and other documents required to authorize such work to commence, and to affix the corporate seal of The Municipality of Kincardine. 3. This by-law shall come into full force and effect upon its final passage. 4. This by-law may be cited as the "Watermain Design and Construction, Tender Acceptance By-law". READ a FIRST, SECOND and THIRD TIME and DEEMED TO BE PASSED this 2nd day of October 2002. --~-- - ~~=~~.~"'" ~-- a '. . REQUEST FOR PROPOSALS KINCARDINE SHORELINE WATER DISTRIBUTION SYSTEM FINAL DESIGN/CONSTRUCTION SUPERVISION Opened: September 26th, 2002 Contractor! Date and Time Tender Certified Agr. Signed Bidder Received Amount Cheque To Bond B.M. Sep 26/02 See Attached Ross and 8:45 am Associates Limited Pryde Sep 26/02 See Attached Schropp 9:58 am McComb Inc. . . -. II II II II II ~ II II II II II II .. II III , Table 3.0 Municipality of Kincardine Shoreline Water Distribution Summary of Proposed Fees Task Amount Trunk Watermain \.0 Assistance with Bylaws 500.00 2.0 Assistance with Oct. 12 meeting 950.00 3.0 Geotechnical 6,990.00 4.0 Preliminary I Final Design 72,700.00 5.0 Updated Cost Estimate 1,750.00 6.0 Specifications and Tender Documents 2,700.00 7.0 Tendering 2,700.00 ---- 9.0 Project Close Out I As Built Drawings 5,500.00 Total Design and Project Close Out 93,790.00 8.0 Construction Administration ( based on 12 week sched 44,400.00 Construction Administration (per week) 3,700.00 Design for Subdivision Watermains: Estimated cost of design and project close out (per km. 5,100.00 ... ... ... Notes: \.0 Costs presented are exclusive ofGST. Cost include all design and disbursements. 2.0 Geotechnical costs include an allowance of $6040.00 for investigations and report. ~,!(\."Hoss . . .- I . . I . .. I I I I I '. I I I , KINCARDINE SHORELINE WATER DISTRIBUTION SYSTEM FINAL DESIGN/CONSTRUCTION SUPERVISION 6.2 ADJACENT SUBDIVISIONS Within Addendum No.1, it was requested that the Consultant provide a cost/per kilometer for the design and constructions supervision of any watermains that would be constructed off the trunk watermain. Based on a total Engineering Fee of $160,875.00 for the trunk watermain, which measures 16.0 km in length, we have assumed that the cost/per kilometer for any adjacent subdivisions is $9,750.00. Cost savings will be realized as tendering and meetings would occur at the same time as tendering and meetings for the trunk watermain. It is proposed, however, that due to the potential significant differences in the subdivisions to be serviced, that detailed Engineering proposals would be provided to the Municipality in advance of any work being conducted on any subdivisions that may be part of the overall project. \:>..~,k Sc..hrol\l> rn "O:>mb. September 25, 2002 13 Pryde Schropp McComb, Inc.