HomeMy WebLinkAboutKIN 97 043 Amended by No.97 49
-
-
-
e
THE CORPORATION OF THE TOWN OF KINCARDINE
f)~O "
~~~ ~o·
~~~
~ ~~
()'t'
BY-LAW
BY-LAW NO. 1997-43
A BY-LAW TO AMEND THE CONSOLIDATED FEE BY-LAW FOR THE TOWN
OF KINCARDINE.
WHEREAS the
Kincardine deems
By-law;
Council for The Corporation of the Town of
it advisable to amend the Consolidated Fee
NOW THEREFORE the Council for The Corporation of the Town
of Kincardine ENACTS as follows:
1. That Schedule "A" to By-law No. 1997-24 be amended
replaced with Schedule "A" to this by-law.
2. This by-law shall come into full force and effect upon
the date of final passage.
3. This by-law may be cited as the "Consolidated Fee
Amendment By-law, 1997 (5)"
READ a FIRST and SECOND time this 5th day of June, 1997.
READ a THIRD time and FINALLY PASSED this 17th day of July,
1997.
~~!
Mayor
:.----
Clerk
BY-LAW NO. 1997-43
SCHEDULE "A"
_conSOlidated Fee By-law No. 1989-118 as amended by by-laws 1990-18,
1990-26,1991-18,1992-15,1992-37, 1992-64,1992-103, 1993-07,
1993-24, 1993-75, 1994-88, 1995-16, 1995-84, 1996-10, 1996-16, 1996-25,
1996-74, 1996-81, 1997-01, 1997-07, 1997-13, 1997-24 and 1997-43.
A. ADMINISTRATION FEES (plus G.S.T. except 5, 6, 9, 10, 11, 12 and 13)
4.
- 5 .
a)
b)
c)
d)
6 .
7.
8 .
9.
1. Commissioning of oaths...... ..................... $
4.67
2. Certification of photocopies .................. .., $
(plus cost of photocopy)
4.67
3. Swearing an affadavit:
(i) if affadavit already prepared
(ii) if affadavit prepared by Town
................ $
$
$
............... .
4.67
9.35
Preparation of document generals ...... ...........
60.75
Site Plan application fees:
Additions and accessory buildings, not exceeding
50% of original building size and decks.......... $ 75.00
Additions or accessory buildings exceeding 50%
of original building size and new buildings....... $ 150.00
Development requiring review of Town engineer... Actual costs
($1,500 deposit, balance to be refunded)
Updates requiring Council approval................ $ 75.00
Application for Part Lot Control (per lot) ........ $ 75.00
Photocopies (per copy) .... ............... ......... $ .50
Encroachment agreement processing (per agreement). $
75.00
Development requiring review of Town engineer... Actual costs
($500.00 deposit, balance to be refunded)
10. Tax collection charge to school boards........... 2% of levy
11. Charge for NSF cheques. . . . . . . . . . . . . . . . . . . . . . . . . . . $ 20.00
- 12. Tax and water certificate (by-law no. 1990-20) . . . $ 21. 00
13 . Water certificate only ......................... . $ 11.00
B. BUILDING PERMIT FEES (By-law No. 1990-25) (no G.S.T. unless noted)
e
1. (a) New buildings (greater than 10 square
metres) ..................................... $. 32/sq. ft.
(b) New Buildings (greater than 10 square
metres) that will have finished
basements shall pay an additional
surcharge for each square foot of
basement area................................. $ .10/sq. ft.
(c) New accessory buildings (greater than
10 square metres) ........................... .$.20/sq.ft.
2. (a)
Additions to existing buildings
............. .
$.20/sq.ft.
(b) Additions to existing accessory buildings .... $.20/sq.ft.
with min.
fee $40.
. . .2
---------
By-law 1997-43
Page 2
411ÞB. BUILDING PERMIT FEES (By-law No. 1990-25) (no G.S.T. unless noted)
e
e
e
3. Alterations, addition and repairs to existing
buildings ........................................ $5/$1000
of est.
cost of
const.
with min.
fee $40.
4. Demolition of a building or portion thereof ...... $
5. Moving permits for buildings. .................... $
40.00
40.00
6. All new and additions to farm buildings
exclusive of dwellings ........................... $ .15/sq. ft.
with min.
fee $40.
7.
Swimming pools (above- or in-ground) ............. $
Change of occupancy permit.. ..................... $
(inspection of building in which occupancy (plus
is changed to more hazardous, refer to Code
Sec. 3. 2 . 9)
40.00
G.S.T. )
40.00
8 .
9.
Renewal permits
................................. .
Same as
above
(2)
Occupancy permits ................................
(Section 2.7.1 and 2.7.2 of the regulations,
refers to occupancy of partially completed
buildings other than single family dwellings)
11. Reinsulation of existing building. ............... $
(if requested)
10.
$ 40.00
(plus G.S.T.)
40.00
12. Building Deposit
a) Buildings with up to 3 units....... ..............$ 1,500.00
b) Buildings with more than three units in 1 structure
$500.00/unit
c)Project with more than one building........ .$1,500 each for
first three, $500 for
each additional building
13. Chimneys and fireplaces .......... ................ $
40.00
14. Sign permit ...................................... $
(those signs regulated by Section 3.7 of the
Code and the Town of Kincardine sign by-law)
40.00
15. Miscellaneous inspections ........................ $ 40.00
16. Zoning compliance certificate .................... $ 40.00
plus GST
17. Permits issued after commencement of work... .......
Regular Permit Fee + (50% of Regular Permit Fee)
18. Tent Permit........................................ $
40.00
. . .3
_c.
e
e
e
By-law 1997-43
Page 3
CEMETERY RATES (By-law No. 1992-77) (plus G.S.T.)
RateDavers:
Single grave (adult) - Land .......................... $
- Care and maintenance ..........
Single grave (infant) - Land........ ................. $
- Care and maintenance .........
Cremation lot
- Land ........................ $
- Care and maintenance ........ $
Non-RateDavers:
Single grave (adult) - Land .......................... $
- Care and maintenance ..........
Single grave (infant) - Land ......................... $
- Care and maintenance .........
Cremation lot
- Land ......................... $
- Care and maintenance .........
RateDavers and Non-rateDavers:
Transfer of ownership ................................
Issuance of replacement certificate '" ...............
Interment - adul t ....................................
- infant (up to five years) ................
- cremated remains .........................
- license fee contribution ..... ............
Additional charge for Saturday, Sunday and holidays
- cremated remains .........................
- adult and infant interments ..............
315.00
150.00
125.00
50.00
160.00
64.00
440.00
176.00
170.00
68.00
230.00
92.00
$ 6.50
$ 6.50
$ 375.00
115.00
100.00
10.00
$ 155.00
285.00
Installation of concrete foundations ................. $ 12.00
per cubic foot
Monument Maintenance Rates:
1) Flat markers over 173 square inches............... $
2) Upright marker 4 feet or less in height and 4
feet or less in length, including the base. ...... $
3) Upright marker more than 4 feet in either height
or length, including the base .................... $
4) Storage................. . . . . . . . . . . . . . . . . . . . . . . . . .. $
D. CONNAUGHT PARK TOURNAMENT FEES (plus G.S.T.)
50.00
100.00
200.00
40.00
1. Payable by all groups wishing to hold a ball tournament at
Connaught Park, with the exception of those groups which pay
an annual user fee to the Town of Kincardine.
Evenings
Full day
. . . . . . . . . . . . . . . . " .... . . . . . . . . . . . . . . . . . .. $
$
........................................ .
50.00
100.00
. . .4
By-law 1997-43
Page 4
eE.
DEVELOPMENT CHARGES
TVDe of service
Single and
Semi-Detached
Dwellings*
$ / unit
Multiple
Dwellings*
$ / unit
Apartments
$ / unit
Transportation
Sewerage
Water
Garbage Collection
Waste Disposal
Police
Fire Department
Parks and Recreation
Davidson Centre
Library
501. 63
781.14
638.60
99.95
63.92
12.22
79.60
105.51
166.59
51. 83
372.21
579.60
473.84
74.17
46.70
9.06
59.06
78.29
123.61
38.46
275.09
428.37
350.21
54.82
34.51
6.71
43.65
57.86
91.36
28.42
Total
2.500.00
1. 855.00
1.371.00
* please refer to definitions section in by-law 1991-83.
e F. FIRE DEPARTMENT FEES (no G. S. T. )
Burning Permit Fee ........................................ $ 5. OOjday
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50. OO/yr
Wood Stove Insurance Inspection............. ..............$ 25.00
Letters to Lawyer/Insurance Companies .....................$ 25.00
Air cylinder refills ...................................... $ 6.00
Fire hose rentals (one length) ............................$ 20.00jday
Copy of fire report ....................................... $ 40.00
Mechanical false alarms.............. .................... .$300.00/
per truck
G. LANDFILL SITE FEES (By-law No. 1990-24) (no G.S.T.)
e
Kincardine residents only:
1. Minimum Charge per visit
......................... .
$
10.00
2. All refuse (commercial or residential) ............. ..$ 70/ton
3. Appliances requiring refrigerant removal per unit ...$ 50.00
4. Tire Deposit fees:
Automobile tires per unit ................. .... ... $
Automobile tires on rim per unit .................
Truck tires per unit .............................
Truck tires on rim per unit ......................
Tractor tires per unit ...........................
3.00
5.00
10.00
15.00
20.00
5 .
Bag Tag
......................................... .
2.50
*
Leaves and organic matter will continue to be accepted at the
Valentine Avenue Landfill Site free of charge.
e
. . .5
By-law 1997-43
Page 5
H.
LICENSING FEES
e1)
Doq Licensinq and Kennel Boardinq Fees (By-law 1991-16)
(no G.S.T. except no. 5 and 7)
1.
For each of first three dogs ..................... $
$
$
2.
For each additional dog after three ..............
3 .
Breeding kennel license
......................... .
4.
Replacement dog tag or transfer to new dog ....... $
Basic
fee
14.00/yr
29.00/yr
75.00/yr
2.00
5. Boarding fees for all animals impounded (dogs or
cats), per day ................................... $ 15.00
(plus GST)
6.
Provided that where the owner acquired the
expiration of 6 months of the year, the license
shall be one-half of the fee noted above.
dog after
fee charge
e
7. Removal & disposal of a non-domestic animal...... $
8. Voluntary out-of-court penalty payments:
(a)
(b)
(c)
(d)
dogs running at large ........................ $
dogs running at large without license ........ $
dogs without license ......................... $
failing to remove dog waste ......... ......... $
$
9. Cat identification tags (each)
.................. .
30.00
30.00
40.00
30.00
40.00
2.00
2. Hawkers and Peddlers License Fee (By-law 1992-38) (no G.S.T.)
Per license per year ................................. $
3. Hot Doq Carts Licenses (By-law No. 1993-51, Amended 1995-73)
(no G.S.T.)
500.00
a) License fee for each cart ....................... . $ 275.00/yr
e b) For each additional cart up to three ............ . $ 275.00/yr
c) For the fourth and any subsequent carts ......... . $ 55.00/yr
4. Lotterv. Raffle and Binqo License Fees (no G.S.T.)
Charitable, non-profit events and community interest groups:
Bingo license....... .................. 1.5 per cent (1.5%) of
prize package for each
bingo
Raffles ............................... 3 per cent (3%) of
pr~ze value for each
raffle
Break-open tickets ...................
value
3 per cent (3%) of prize
of each box
e
. . .6
By-law 1997-43
Page 6
H. LICENSING FEES cont'd
_5.
Public Hall Licensinq (By-law No. 1989-120) (no G.S.T.)
Item Fee
Grade 1 - for a public hall having a licensed capacity
of 1,000 persons or over........ ........... $ 80.00/yr
Grade 2 - for a public hall having a licensed capacity
between 601 and 999 persons ................
$ 70.00/yr
$ 60.00/yr
$ 25.00
Grade 3 - for a public hall having a licensed capacity
between 60 and 600 persons .................
Transfer of public hall license to new owner.........
6 . Refreshment Vehicle Licenses (No G.S.T.) (By-law No.1993-6)
a) License fee for each vehicle .................... . $ 275.00/yr
e b) For each additional vehicle up to three. . . . . . . . . . . $ 275.00/yr
c) For the fourth and any subsequent vehicles....... . $ 55.00/yr
7. Taxi Licensinq (By-law No. 1997- ) (no. G.S.T. )
a) Owner/Driver (including one vehicle) ............ . $ 50.00/yr
b) Taxi broker ..................................... . $ 50.00/yr
c) For each additional taxi cab owned
by the same owner/driver ........................ . $ 20.00/yr
d) For one limousine ............................... . $ 30.00/yr
e) For each additional limousine owner
by the same owner/driver ........................ . $ 20.00/yr
f) For each driver who is not an owner
e (per year) ...................................... . $ 20.00/yr
g) For the renewal of a driver's license
(if previously suspended) ....................... . $ 10.00
h) For a replacement of a lost license ............. . $ 10.00
1. PAYMENT IN LIEU OF PARKING (No G.S.T. )
a)
All qualifying C1 zoned properties
.............. .
$ 1. 00
per space
b) C1 properties where building has been altered to
increase square footage of building used for
commercial purposes, or use changes from
residential to commercial.. ....................... $ 1,500.00
per space
c) Non-qualifying C1 zoned properties................ $ 1,500.00
per space
e
d) All other commercially zoned properties must provide physical
parking spaces.
. ..7
e
_8.
_
e
By-law 1997-43
Page 7
J. PLUMBING INSPECTION FEES (By-law No. 1991-23) (no G.S.T.)
1. Exclusive of a building drain and a building-
sewer ............................................ $ 22.00
plus $2.50
per fixture unit
2. Inspection of a building sewer:
For the first 100 feet ...........................
For each 100 feet thereafter .....................
$ 3.00
$ 2.00
$ 3.00
$ 27.00
3. Inspection of a building drain ....... ............
4. Inspection of a sewer connection .................
5. Inspection fee for sewage injectors ........... Equal to three
fixture units
6. Alterations to plumbing without addition of
fixtures, inspection fee ......................... $
5.00
7. Inspection of factory-built home... ........... Basic fee plus
$22.00 plus
fixture fees
if applicable
When plumbing inspector notified that any plumbing is ready for
inspection and the same is not ready when the plumbing inspector
intends to inspect the same or if the plumbing fails to conform to
any requirements to which the same is bound to conform, an
addition fee of $20.00 for each additional inspection or visit by
the plumbing inspector will be required.
K.
RENTAL FEES
1)
Tent Rental Fees
Complete Rental - Delivery, Set-Up, Take Down and Pick-up
$500 + $35(GST) + $40(permit) ~$575.00
Rental of tent - Delivery, Take Down and Pick-Up
$400 + $28 (GST) + $40(permit) ~$468.00
Rental of Tent - Take Down and Pick-Up
$350 + $24.50(GST) + $40(permit) ~$414.50
2. Town Hall. Annex and Librarv (plus G.S.T.)
Council Chambers and Librarv Meetinq Room
No admission charged:
Full day .................. . $ 35.00
Half-day or evening ....... . $ 25.00
Full day .................. . $ 45.00
Half -day or evening ....... . $ 35.00
Admission charged:
Auditorium
No admission charged:
Full day .................. . $ 45.00
Half-day or evening ....... . $ 40.00
Full day .................. . $ 65.00
Half-day or evening ....... . $ 55.00
Admission charged:
. . .8
eL.
e
e
-
By-law 1997-43
Page 8
SALE OF LOTS - KINCARDINE INDUSTRIAL PARK (plus G.S.T.)
Per acre ............................................. $12,000.00
M.
SERVICE CHARGES
1.
Mechanic Labour Rate (no G.S.T.)
Charge per hour ...................................... $
2. Road Cut Permit
30.00
Each permit. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. $
50.00
3. Sanitarv Sewer Service Charqe (no G.S.T.)
a. Residential:
Per residential unit, per year ................... $
115.00
b. Commercial:
Per commercial building, per year. ............... 80% of
metered water charge
for previous year
c. Industrial sewage in excess of 30.4 m3 /month......$ .50/m3
4. Sewer Connection Charqes: (G.S.T. only on passed-on costs)
All costs to be paid in advance of the work.
l.
a)
No sewer main in front of property:
Capital contribution:
- single and semi-detached (each) ................ $
- multiple dwellings (each) ......................
- apartments (each) ..............................
- commercial establishments .. ....................
2,030.96
1,506.83
1,113.74
2,030.96
Refer to development charges by-law for definitions.
The capital contribution charges are for 1994 and will have to
be updated, as of January 1st of each year starting January
1st 1995, based on the "Composite Southam Construction Cost
Index, Ontario Series" for the previous year.
b)
Sewer main, lateral and connection charge:
Property owner to pay the Town's cost to install
from the sewer main to the property line, plus
administration and inspection charges.
lateral
10% for
Property owner is responsible for the installation and
costs related to the connection from the property line to
the building.
2. Sewer main already in front of property:
a) Capital contribution:
No charge if frontage charge has been paid at the time of the
original sewer project.
If frontage charges have never been paid, costs would be the
same as 1 (a) above.
b) Lateral and connection charge:
Same as 1 (b) above.
. . .9
--------
By-law 1997-43
Page 9
.::
SERVICE CHARGES cont'd
Taxi rates (includes GST)
a) For the first one-tenth of a kilometer or part thereof ...$ 2.50
b) For each additional one-tenth of a kilometer
or part thereof .......................................... $ 0.12
c) For waiting time under engagement: for each minute .......$ 0.30
for each hour .........$ 18.00
d) Senior citizens discount . . . . . . . . . " . . . . . . . . . . . . . . . . . . . . . . . $ 0.35
6. Water Rates
a) Water rates for metered properties - minimum bill per month
Size of DiDe Amount of water used Minimum bill
20 mm. up to 13 cubic meters $ 10.00
25 mm. up to 25 cubic meters 28.55
e 40 mm. up to 50 cubic meters 57.08
50 mm. up to 80 cubic meters 91.33
75 mm. up to 150 cubic meters 185.51
100 mm. up to 250 cubic meters 285.41
150 mm. up to 500 cubic meters 570.78
b) Water rates after the minimum allowable consumption per month:
First 59 cubic meters .............................$0.36/c.m.
Balance ........................................... $0. 31/c. m.
c) Flat rate for summer cottage (per season) ........... .$130.00
d) Connection charge........ ........................... .$350.00
e) Contribution to meter ................................ $130.00
f) Disconnect/Reconnect (plus GST) ......................$ 50.00
g)
eh)
Township fire hydrant maintenance/rental.. ....... .$150.00/per
hydrant
Water rates for meters on fire hydrants:
Flat minimum rate for first 80 cubic meters ........ ..$ 91.33
Rate per cubic meter for next 59 cubic meters ........$ 0.36
Rate per cubic meter for balance ......... ............$ 0.31
i) Rates outside the Town of Kincardine
and/or for non-ratepayers ....... .......... 150% of Town rate
-