THE CORPORATION OF THE MUNICIPALITY OF KINC INE
BY-LAW
NO. 2003 - 91
BEING A BY-LAW TO ACCEPT A TENDER TO DRILL A NE WELL AT THE
DENT WELL SITE AND CONDUCT A WELLHEAD PROTE ION STUDY
(W.D. Hopper & Sons Ltd., Wilson Associates
!
I
I
WHEREAS Section 11 (2) of the Municipal Act, 2001, S.O. 2001 ¡ c. 25 authorizes
municipalities to pass by-laws respecting matters within the sphrre of jurisdiction
of water distribution; I
AND WHEREAS the Council for The Corporation of the MuniciP~lity of Kincardine
deems it expedient to accept a tender to drill a new well and c nduct a wellhead
protection study at the Dent Well Site in the former Village of Tiv rton
NOW THEREFORE the Council for The Corporation of tht' Municipality of
Kincardine ENACTS as follows:
,
1. That the tender of W.O. Hopper & Sons Ltd. in the amo~nt of $44,437.50
including all applicable taxes, be hereby accepted. I
2. That the tender of Wilson Associates to conduct a wJllhead Protection
Study in the amount of $7,500.00, plus all applicable 1axes, be hereby
accepted. '
3.
That the Mayor and CAO be hereby authorized to sign on behalf of the
Council for The Corporation of the Municipality of Kincar ine any contracts
and other documents required to authorize such work to mmence.
4. This by-law shall come into full force and effect upon its fi al passage.
I
i
5. This by-law may be cited as the "Dent Well and Wellhea~ Protection Study
Tender Acceptance By-law". I
READ a FIRST, SECOND and THIRD TIME and DEEMED TO BE P+sSED this 9th day
of July, 2003.
~
I~
>
,BMROSS
L
engineeringbener communities
....~:. Fó:C~!¡·~~
....... .....
-'-
,,~- -- - ---'"
..
B. M. ROSS AND ASSOCIATES UMITED
Consulling Eng'I"eers
62 ~o'1h Street Goc:terlch, Of\. ,.., 71.. 2":"':'
P (5'9-¡524-264~ . r (5'9"52""':'':C~
WW'W.bmrOSS.net
....
'.-:~
/
.':....
.:::
".
-'.
. .
File No. 03028
April 30, 2003
Municipality of Kincardine
1475 concession 5
R. R. #5
Kincardine, Ontario
N2Z 2X6
...:....:::
.....:.~.,.:<~.._..----
',,'
......................
~......- .
-'~.
-'
Aitention: Mr. Jim O'Rourke
.' Public Works Manager
DearJim:
RE: Tiverton WeU Supply
Dent Well Construction
.
-'Ç
'Three (3) tenders were received on April 29, 2003 for the constrUction and hydrogeologic
assessment of a new well to replace the existing Dent Well. The tenderers are licensed well
drillers and each was invited to bid on the project. The following table summarizes the tenders.
Weeks to Totai Price Hydrogeological . Wellbead
Tenderer Protection
Complete (iDcL GST) CODSultant Study
W. D. HODDer & Sons Ltd 12 $44.437.50 Wilson Associates $7.500.00
Davidson DrillinlZ Ltd. 4 to 6· $53.660.50 LotoV\'ater Ltd. $8.500.00
International Water 11 $61,257.5{) N/A $5,200.00
Supplv Ltd.
·Excluding laboratory time (estimated at 6 weeks)
-
The work program specified in the Request for Proposal consists of drilling a 200 mm
(8") diameter well to a depth of 49 m on the existing Dent Well site. Also included is a
hydrogeological assessment to determine if the groundwater is under the influence of surface
(GUDI), pumping tests, laboratory analyses, application for Permit to Take Water and the
abandonment of the existing well.
·
.
~
I
I ~
~ r-r
-2-
The specified depth of the new well is estimated and the actual depth may differ. The
tendered unit costs of drilling beyond 49 m are S3251m, S200/m and $751m for Hopper,
Davidson and International Water, respectively.
The hydrogeological consultants' approaches to assessing GUm vary somewhat but all
are acceptable practices. Wilson Associates proposes to drill a 50 mm (2") diameter monitDring
well, if granular deposits are encountered in drilling the main well, at an extra cost of$2,OOO.00
+ GST. Lotowater's approach involves a series of tests and analyses on the soil strata, well
casing and water samples to detennine surface water influence. International Water's
hydrogeologists propose to assess surface water influence by monitoring the nearby stream
during pumping tests. Lotowater and International Water's costs for the assessment are included
in the well construction costs.
If the new well is considered GUDI, the MaE will require a Wellhead Protection Study
be completed. The costs of these studies are presented above and are!!Q! included in the Total
Price of well construction. The existing wells in Tiverton are not consideredGUDL
We have worked with the three tenderers on numerous projects and all are well
experienced in this type Dfwork. We would not hesitate to recommend any of them for the
project. Based on their competitive pricing, we recommend the cDnstrUCtion and hydrogeologic
assessment of the new Dent Well be awarded to W. D. Hopper &. Sons Ltd.
All of which is respectfully submitted.
Yours very truly,
B. M. ROSS AND ASSOClA TES LIMITED
BP:jj
~~
'i<. I
~~ e,P.&g.
Per