HomeMy WebLinkAbout24 113 - 2024 Budget Amendment (1) By-lawTHE CORPORATION OF THE MUNICIPALITY OF KINCARDINE
Being a By-law to Amend By-law No. 2024 — 030; being a By-law Adopt the
Estimates of all Sums Required During the Year 2024
Whereas Section 290 of the Municipal Act, 2001, S.O. 2001, c. 25, as amended, provides
that for each year, a local municipality shall, in the year or the immediately preceding year,
prepare and adopt a budget including estimates of all sums required during the year for the
purposes of the municipality; and
Whereas the Council of The Corporation of the Municipality of Kincardine, with passage of
By-law No. 2024 - 030, adopted the estimates of all sums required during the year 2024;
and
Whereas the Council of The Municipality of Kincardine deems it deems it necessary to
amend the Operating Budget as per: 1) Resolution #05/22/24-06 to add $15,000 to the
Strategic Planning Budget to development of a Strategic Plan, funded by the Contingency
Reserve; 2) Resolution #06/06/24-02 to utilize $15,000 from the Affordable Housing
Reserve Fund for the Flourish quote; and 3) Resolution #07/10/24-03 to add $15,000 to
update the 9/21 Business Park Lands ASDC By-law, funded by the Contingency Reserve;
and
Whereas the Council of The Municipality of Kincardine deems it deems it necessary to
amend the Capital Budget as per: 1) Resolution #03/06/24-04 to add $92,000 regarding
Pier Safety Ad -Hoc Committee report and funded through the Lifecycle Reserve Fund; 2)
Resolution #03/27/24-05 for the Davidson Centre Ice Resurfacer of $11,763.45 to be
funded, from the sale of the surplus Olympia Ice Resurfacer and the Lifecycle Reserve
Fund; 3) Resolution #3/27/24-06 for the Kincardine Marina fuel tanks of $497,411 to fund
the additional project costs of $169,411 from the Lifecycle Reserve Fund; 4) Resolution
#03/27/24-10 to increase the cost of the Kincardine Water Treatment Reservoir by
$60,000, funded from the Water Reserve Fund 68; 5) Resolution #04/10/24-07 to increase
the cost of the Tandem Plow Truck to $460,000 with the $35,000 overage to be funded
through the Lifecycle Reserve Fund; and 6) Resolution #07/10/24-03 to fund the estimated
MTO upgrades of $800,000 from the existing Floating Rate Capital Loan through
Infrastructure Ontario, with the costs to be recovered through future development
(ASDCs); and 7) Resolution #08/14/24 - 09 to add KWTP Raw Water Intake Line of
$300,000 funded from the Water Reserve Fund 68; now therefore be it
Resolved that the Council of The Corporation of the Municipality of Kincardine Enacts as
follows:
That Schedule `A' 2024 Operating Budget Summary of By-law No. 2024 — 030 be
repealed and replaced with the attached Schedule W.
2. That Schedule `B' 2024 Capital Budget Summary of By-law No. 2024 — 030 be
repealed and replaced with the attached Schedule `B'.
3. That By-law shall come into full force and effect upon its final passage.
4. That By-law may be cited as the "2024 Budget Amendment (1) By-law".
Read a First, Second and Third Time and Finally passed this 14' day of August, 2024.
Kenneth Craig Jennifer Lawrie
Sign with Consign. Cloud be Read . Sign�d with Consign. Cloud (2024/08 .
Seri with SCorsitnO or Adobe Reader. Seri with veonsi nO or Adobe Reader.
Mayor
Clerk
Schedule 'A'
2024 Operating Budget Summary
2023
2024 Variance
% Variance
Total Budget
Budget
2024 to 2023
2024 to 2023
Revenue
Taxation
Corporate Services
21,976,875
23,521,496
1,544,621
7%
Treasury
2,983,348
2,716,050
(267,298)
(9%)
HR
4,000
319,039 124,451
(4,000)
(194,588)
(100%)
(61 %)
Legislative Services
Total Corporate Services
3,306,387 2,840,501 (465,886)
(14%)
Strategic Initiatives
30,000 30,000
Strategic Initiatives
Tourism
48,950
24,450
(24,500)
(50%)
Economic Development
113,950
93,950
(20,000)
(18%)
Physician Recruitment
237,200
293,520
56,320
24%
Total Strategic Initiatives
400,100
441,920
41,820
10%
Infrastructure & Development
Development Services
735,162
789,310
54,148
7%
Environmental Services
7,630,281
7,745,599
115,318
2%
Operations
438,400
396,300
(42,100)
(10%)
Total Infrastructure & Development
8,803,843 8,931,209 127,366
1 %
Community Services
1,132,493
2,792
Parks & Facilities
f-7
1,135,285
-
Community & Recreation Programs 1,227,329 1,276,716
49,387
4%
Total Community Services 2,359,822 2,412,001 52,179 2%
Fire Department
Fire Department 191,393 199,341 7,948 4%
Total Fire Department 191,393 199,341 7,948 4%
Total Revenue 37,038,420 38,346,468 1,308,048 4%
Expenses
Council and CAO
Council 402,065 414,362 12,297 (3%)
CAO
370,475
401,348
30,873
(8%)
Total Council and CAO
772,540
815,710
43,170
(6%)
Corporate Services
6,907,067
1%
Treasury
6,956,1981
-49,131
HR
302,969
341,174
38,205
(13%)
Legislative Services 3,250,974 3,239,771-11,203
Total Corporate Services 10,510,141 10,488,012-22,129
Strategic Initiatives
Strategic Initiatives
162,386
232,971
70,585
(43%)
Arts, Culture & Heritage
5,800
-5,800
100%
Tourism
296,979
327,750
30,771
(10%)
Economic Development
417,340
511,680
94,340
(23%)
Physician Recruitment
384,971
384,555
-416
Total Strategic Initiatives
1,267,476
1,456,956
189,480
(15%)
Infrastructure & Development
1,610,317 160,618
8,516,152 260,177
(11 %)
(3%)
Development Services
Environmental Services
1 1,449,6991
1 8,255,9751
12024 Operatinq Budqet Summary
_ Operations
Total Infrastructure & Developmi
Community Services
Parks & Facilities
Community & Recreation Programs
Total Community Services
Fire Department
Fire Department
Total Fire Department
Total Expenses
Surplus/(Deficit)
2023
2024
Total Bud et Budget
6,597,382
6,731,122
16,303,056
16,857,591
1 4,448,728
2,204,142
4,904,991
2,161,788
6,652,870
7,066,779
1,532,337 1,661,420
1,532,337 1,661,420
37,038,420 38.346.468
Variance % Variance
2024 to 2023
2024 to 2023
133,740 (2%)
554,535 (3%)
456,263
(10%)
-42,354
2%
413,909 (6%)
129,083
(8%)
129,083
(8%)
1.308.048 (4%)
Schedule 'B'
2024 Capital Budget Summary
Carry Forward 2024
Total
Corporate Services
Legislative Services
53,000
53,000
E Clerk
9013 Ontario CCTV Program
Total E Clerk
53,000
53,000
Total Legislative Services
53,000
53,000
Total Corporate Services
53,000
53,000
Strategic Initiatives
Tourism
F Tourism
9661 Downtown Dig Beautification Project
230,000
230,000
9662 Christmas Light Replacement
1 25,000
100,000
125,000
Total F Tourism
25,000 330,000
355,000
Total Tourism 25,000 330,000
Economic Development
X Economic Development
9032 Website Redevelopment 35,245
355,000
35,245
Total X Economic Development 35,245
35,245
Total Economic Development 35,245
35,245
Total Strategic Initiatives 60,245 330,000
390,245
Infrastructure & Development
25,000
Development Services
S Planning
9670 Tree Canopy Replacement
25,000
Total S Planning
25,000
25,000
Total Development Services
25,000
25,000
Environmental Services
G Water
9502 K WATER INTERNAL/DONATED
40,000
40,000
9509 Teflon Boards/Injector Replacement
821
7,500
8,321
9511 K-WATER METER
12,000
12,000
9512 Contingency Valve Replacement Program
60,000
60,000
9515 HYDRANT
10,000
10,000
9516 Highland Drive Watermain Replacement
600,000
600,000
9517 Scott's Point Well Replacement
90,872
90,872
9519 Andrew Malcolm Watermain Replacement
90,455
90,455
9526 Tiverton Water Tower Maintenance
25,000
115,000
140,000
9527 Kincardine WTP Roof Replacement
130,000
130,000
9528 Automatic Rushers (freeze proof) for Deadends
20,000
20,000
9529 Well Tiles
14,000
14,000
9532 Kincardine Water Tower Aeration
25,000
57,000
82,000
9533 Armow Drinking Water Upgrades
100,000
100,000
9534 Water Meter Replacement Program and Software U
700,000
700,000
9536 Water Tower Rescue Kit
10,0001
10,000
9537 Dent Well Upgrades
25,0001
25,000
9540 Briar Hill Well Poly System
10,0001
10,000
2024 Capital Budget Summary
Carry Forward 2024
Total
9541 KWTP Reservoir Waterproofing
9542 Investigate Tiverton Water Supply Alternatives
310,000
200,000
7,500
40,000
300,000
20,000
310,000
200,000
7,500
40,000
300,000
9544 Kincardine Tower Chlorine Pumps
9545 Filter #1 Lining
9546 KWTP Raw Water Intake Line
9548 Scott's Point Tile Bed and Drainage
20,000
Total G Water
952,148 2,068,000
3,020,148
H Wastewater
45,000
20,000
20,000
45,000
20,000
20,000
9457 Goderich St LS Generator
9458 Park St P.S Roof Replacement
9460 Mahood Effluent Station Roof Replacement
9461 Durham St L.S Roof Replacement
20,000
20,000
9462 Goderich Street Pump/ATS/Electrical
55,000
55,000
9463 Effluent Station Rack A UV Rebuild
30,000
30,000
9464 Queen St Sewermain Replacement
1,343,823
1,343,823
9465 Durham St Pump Station Upgrades 2022
1,578,502
1,578,502
9469 Park Street Pump Station and Forcemain Upgrades
160,233
160,233
9470 Genset for Kincardine Effluent Station 2022
111,669
111,669
9472 Mount Forest Ave Servicing
1,285,000
1,285,000
9473 Kincardine Ave Servicing
1,950,000
1,950,000
9475 Sewer Flushing Repairs and Contingency
27,500
27,500
9476 BEC Repairs
47,500
47,500
9481 Maple St Pump Station Upgrades
100,000
100,000
9486 Replacement of Air Relief Valves
22,000 22,000
44,000
30,000
9487 WASTEWATER - INTERNAL/DONATED
30,000
Total H Wastewater
6,498,727 369,500
6,868,227
L Waste Management
10,000
10,000
20,000
10,000
10,000
20,000
9549 Valentine Ave Upgrades
9550 Elgin Market Building
9551 Leachate Pump and Transfer Line
9552 Landfill Monitoring Stations
15,000
15,000
9553 Replace Waste Meter
10,000
10,000
9554 Replace Leachate Handheld Equipment
25,000
25,000
9557 KWMC - Construction of Cell #2 (B/C)
212,9061
212,906
9558 Replace Sludge Transfer Pump
15,000
15,000
Total L Waste Management
212,906 105,000
317,906
Y Stormwater
32,500
355,000
32,500
9412 Storm Flushing Program Repairs/Contingency
9417 Kincardine Kinloss Branch A Enclosure
355,000
Total Y Stormwater
387,500
387,500
Total Environmental Services
7,663,781 2,930,000
10,593,781
Operations
74,362
I Roads
9130 Concession 2 and BR 23 Improvements
74,362
33,000
1,825,000
9147 Tiverton Public Works Shed repairs
33,000
1,025,000
800,0001
9150 Highway 21 & Russell Street Intersection
2024 Capital Budget Summary
Carry Forward 2024
Total
9151 Roof Replacement Underwood Works Shop
9152 Rural Paving - Con 8 - S/R 15 - Boundary
75,000
1,480,000
70,000
3,075,000
75,000
1,480,000
70,000
3,075,000
9153 Lake St Road Improvements
9164 Bruce Ave Reconstruction - Park St to Hwy 21
Total I Roads
1,132,362 5,500,000
6,632,362
J Bridges, Culverts, Storm
250,000
120,000
250,000
120,000
9114 Various Culvert Repair
9115 Bridge Master Plan
Total J Bridges, Culverts, Storm
370,000
370,000
K Fleet
570,000
460,000
9200 ES - KWMC -Compactor 4449 Refurb
570,000
9201 OPS- Replacement Tandem Plow/Sander 3460
460,000
23,000
40,000
90,000
90,000
9202 OPS- Replacement Riding Mower Cemetery 5559
23,000
9203 Boom Mower Pro Saw- Attachment
40,000
9204 ES - Replacement of Half Ton truck 4394
90,000
9205 OPS -3454 P/U Truck
90,000
9206 Ice Resurfacer
161,763
161,763
9207 MEC-Vehicle Scanner - Diagnostics
24,000
24,000
9208 OPS-Barrier Mower
80,000
80,000
9209 CS -New Skid Steer
90,000
90,000
9210 ES -Enclosed Cargo Trailer
20,000
20,000
9211 Roadside Flail Mower Attachment
40,000
40,000
9212 CS Van for Lead Hand Position
60,000
60,000
9278 CS - New Mower - Parks
65,000
65,000
9280 OPS - Replacement One Ton Dump Truck 5561
26,959
26,959
9283 OPS Replacement Single Axel Plow/Sander 3419
211,941
211,941
9289 Water Tank (for tandem truck)
35,000
35,000
60,000
9497 3/4 Ton Sewer Van 4399 Replacement
60,000
Total K Fleet
333,900
1,813,763 2,147,663
V General
40,000
220,442
9100 EV Charging Station Queen St Parking Lot- Replaa
40,000
9101 New EV Charging Station Victoria Park
220,442
48,824 65,000
9539 Phase 2 Cityworks Software Implementation
113,824
Total V General 48,824 325,442
374,266
Total Operations 1,515,086 8,009,205
9,524,291
Total Infrastructure & Development
9,178,867 10,964,205
20,143,072
Community Services
80,000
Parks & Facilities
N Trails
9614 Red & Green 10KM Loop
80,000
9615 Birchwood Public Walkway Improvements
20,000
20,000
9666 TRAILS Ash Tree Removal
60,000
10,000
60,000
10,000
9667 TRAILS Bollards & P-gates
Total N Trails 100,000 70,000
1P Parks
9610 PARK Special Event Picnic Tables 25,0001
170,000
25,000
2024 Capital Budget Summary
Carry Forward 2024
Total
9611 Buildings Review - Multiple Facilities
9622 Connaught park - diamond 2 backstop
60,000
60,000
80,000
80,000
9624 Station Beach - fence along marina
10,836
10,836
9626 Station Beach - remodel, AODA upgrades
45,000
20,000
65,000
9634 PARKS Tiverton Splash Park
300,000
300,000
9635 Station Beach - boardwalk design development
26,995
26,995
9636 CS -Loader Arm and Bucket (JD3033)
25,000
25,000
9640 PARK Bleachers Replacement
50,000
50,000
9644 Victoria Park - new band shell design, consultation
25,000
25,000
9654 Beach access points - steps assessment
25,000
25,000
9671 PARKS Reunion Park Sewer Line Replacement
55,000
55,000
9672 PARK Macpherson Playground Replacement
400,000
400,000
9673 PARK DC Track Field Viewing Area & Accessibility
80,000
80,000
9674 PARK Connaught Park Ball Diamond Lighting
200,000
24,000
92,000
200,000
24,000
92,000
9675 PARK Soccer Goals
9676 PARK Pier Safety Upgrades
Total P Parks
272,831 1,271,000
1,543,831
R Facilities
21,000
21,000
9010 FAC W.E. Thompson Doors
9018 MAC Window Replacement
30,000
30,000
9019 FAC MAC Furniture
18,000
18,000
9020 MAC - key fob security system
20,000
20,000
9030 Medical Clinic Conversion to Natural Gas
40,000
40,000
9561 Medical centre - centralized HVAC controls
20,000
20,000
9564 Medical Centre - 1 st floor repaint
40,000
25,000
65,000
9574 Art gallery - Key fob security system
10,000
10,000
9577 DC LED lighting conversion remainder of building
130,000
130,000
9581 Conversion of Parks & Recreation Facilities to Natui
40,000
40,000
9588 HVAC Replacement - Davidson Centre
60,000
60,000
9591 DC Building condition assessment
92,775
92,775
9592 DC - Health Club flooring replacement
60,000
60,000
9598 HVAC Units - Tiverton Sports Centre
100,000
100,000
9603 WCCC Plans
230,000
230,000
9638 Kincardine Library- Renovations
71,175
71,175
9639 Tiverton Library - Ramp and Stairs
45,000
45,000
9641 Lighthouse repainting
175,000
175,000
9656 FACILITIES Fuel Tank Replacement Marina
300,158
169,411
469,569
9700 Kincardine Library - Upgrade LED lighting
10,000
10,000
9701 DC Pool LED lighting
40,000
40,000
9702 DC roof EPDM replacement
700,000
700,000
9703 FAC DC Boiler Retrofit
30,000
30,000
9704 FAC Tiverton Washroom Accessibility Renovation
125,000
125,000
9705 FAC DC Ramp Renovation
75,000
75,000
9706 FAC DC Tables and Carts
20,000
20,000
9707 FAC Ice Edger Replacement
10,000
10,000
9708 FAC WCCC Replacement of 2 furnaces
20,0001
20,000
2024 Capital Budget Summary
Carry Forward 2024
Total
9709 FAC Tiverton Library Window Replacement
Total R Facilities
Total Parks & Facilities
Fire Department
U Fire Department
15,000
15,000
974,108 1,768,411
2,742,519
1,346,939 3,109,411
4,456,350
_
125,000
9039 Compressor Replacement
125,000
9040 Communications Equipment
100,000
100,000
9041 Lifesaving Equipment
30,000
30,000
9049 Rescue Truck Replacement (Tiverton Station)
425,000
425,000
9052 Womens Facilities Upgrade 45,00,01
9056 Replacement of Pumper 12-2 Kincardine Fire Statio 850,000
Total U Fire Department 1,320,000 255,000
45,000
850,000
1,575,000
Total Fire Department
1,320,000 255,000
1,575,000
Total Community Services
2,666,939 3,364,411
6,031,350
Total Capital Departments
11,906,051 14,711,6161
26,617,667