HomeMy WebLinkAbout24 097 - Energy Conservation and Demand Management Plan By-lawTHE CORPORATION OF THE MUNICIPALITY OF KINCARDINE
BY-LAW
NO. 2024 — 097
Being a By-law to Adopt the
Energy Conservation and Demand Management Plan
for the Municipality of Kincardine
Whereas Section 8 (1) and 9 of the Municipal Act, 2001, S.O. 2001, c. 25, as
amended, provide that the powers of a municipality under this or any other Act shall
be interpreted broadly so as to confer broad authority on the municipality to enable
the municipality to govern its affairs as it considers appropriate and to enhance the
municipality's ability to respond to municipal issues and has the capacity, rights,
powers and privileges of a natural person for the purpose of exercising its authority
under this or any other Act; and
Whereas Ontario Regulation 25/23 under the Electricity Act, 1998 requires
municipalities to develop a Conservation and Demand Management (CDM) Plan,
and update it every five years; and
Whereas the Energy Conservation and Demand Management Plan in the
Municipality of Kincardine, was developed to as per the regulation and
guidelines provided by the Ministry of Energy and covers from July 1, 2024 until
June 30, 2029; now therefore be it
Resolved that the Council of The Corporation of the Municipality of Kincardine
enacts as follows:
1. That the Energy Conservation and Demand Management Plan for the
Municipality of Kincardine, contained in Schedule A to this By-law forms
part of this By-law, is hereby adopted.
2. That this By-law shall come into full force and effect upon third and final
reading.
3. That this By-law may be cited as the "Energy Conservation and Demand
Management Plan By-law".
Read a First, Second and Third Time and Finally passed this 26t" day of June,
2024.
Kenneth Craig E
Signed with Consign0 Cloud (2024/07/01)
Verify with verific.com or Adobe Reader.
Jennifer Lawrie
Signed with Cons ign0 Cloud (2024/07/02)
Verify with verifio.com or Adobe Reader.
Mayor Clerk
Schedule 'A'
t 1CI�s _ T
I(�i,NCAizpINP_
Energy Conservation and Demand
Management Plan
2024-2029
May 31, 2024 (Draft R1)
Municipality of Kincardine
Table of Contents
1.0 Overview..................................................................................................................................1
Ontario Regulation 25/23 requires public agencies to: ...................................................................
1
2.0 The Current Municipal Energy Overview....................................................................................4
How we Manage Energy Today........................................................................................................... 4
OurMunicipal Energy Needs...............................................................................................................4
Strategic Energy Conservation Planning..............................................................................................5
3.0 Kincardine's Corporate Energy Conservation Commitment........................................................5
Declaration of Commitment............................................................................................................. 5
Our Conservation Vision...................................................................................................................6
OurGoals.......................................................................................................................................... 6
OurObjectives.................................................................................................................................. 6
Our Energy Conservation Target...................................................................................................... 7
Integrated Strategy Focus Areas.......................................................................................................... 8
4.0 Our Successes and Completed Energy Projects...........................................................................8
5.0 The Energy Conservation Team................................................................................................12
6.0 Current and Historical Energy Results......................................................................................13
7.0 Renewable Energy...................................................................................................................17
8.0 Plan Implementation...............................................................................................................17
PLAN................................................................................................................................................
19
DO...................................................................................................................................................
19
CHECK..............................................................................................................................................
19
ACT..................................................................................................................................................
19
Energy Conservation Project Planning Process..............................................................................20
9.0 Update and Review Process.....................................................................................................22
10.0 Energy Conservation Action Plan...........................................................................................23
Creating a Culture of Conservation....................................................................................................
23
EnergyEfficiency Standards...............................................................................................................
23
Energy Monitoring and Tracking........................................................................................................
24
Energy Conservation Action Plan.......................................................................................................
24
Disclaimer: This document has been prepared by the Ontario Clean Water Agency on
behalf of the Municipality of Kincardine in accordance with Ontario Regulation 25/23
under the Electricity Act, 1998 for submission to the Ministry of Energy. This Plan is
constantly evolving and may be revised to reflect the most current information and
circumstances. The Municipality of Kincardine, its council, shareholders or representatives
do not accept any liability whatsoever by reason of, or in connection with, any information
in this document or any actual or purported reliance on it by any person. The Municipality
of Kincardine may update any information in this document at any time.
1.0 Overview
In 2014, the Municipality of Kincardine (Municipality) developed a 5-year Conservation and
Demand Management (CDM) Plan in compliance with the requirements of Ontario Regulation
397111 under the Green Energy Act, 2009. This regulation was replaced with Ontario Regulation
507118 in 2018, and recently with Ontario Regulation 25123 in 2023 under the Electricity Act,
1998. The CDM plan was updated in 2019, under regulation 507/18, by the Municipality with the
support and direction from Blue Sky Engineering & Consulting Inc. (Blue Sky) and the Local
Authority Services (LAS).
Under Ontario Regulation 25123, the requirements far broader
public sector energy planning and reporting are identical to
those under the former Ontario Regulation 397 11 and 507118.
Under Ontario Regulation 25123, all BPS organizations, including municipalities and townships,
are required to report annually on energy use and greenhouse gas (GHG) emissions. The
organizations are also required to develop a CDM plan and update it every five years, with this
first update posted July 1, 2019. This document is the second update, which is required by July
15t 2024.
Ontario Regulation 25/23 requires public agencies to:
Report annually on energy use and CHC emissions.
Develop five-year energy CDM plans starting July 1, 2014 with the current update
due July 1, 2024.
Post annual reports and 5-year plans to the agency's website and make printed
rsions available for the public.
The Municipality of Kincardine retained OCWA to build on the existing CDM Plan, incorporating
the experiences gained and results in energy conservation over the last five years. This updated
CDM plan was developed as per the regulation and guidelines provided by Ministry of Energy and
covers the period of 2019 to 2024. The plan was presented to the council and approved on June
26, 2024.
There are significant advantages to developing and implementing a CDM Plan. The lowest cost
options for meeting energy demands could be to implement simple energy efficiency measures.
Simple actions of turning off lights and appliances, shutting off heaters in the summer and
establishing efficient usage times, efficient production requirement, and many other actions can
result in energy savings, while providing many other environmental, economic and social
benefits, including reducing GHG emissions. Reducing energy consumption translates to
reducing costs incurred by municipalities and the savings could be directed to more important
works in the municipalities.
The Municipality seeks to incorporate energy efficiency throughout all of its activities to minimize
the fiscal impact of energy on operating costs and its related environmental impacts. This will
include organizational and human resources management procedures, procurement practices,
financial management and investment decisions, and facility operations and maintenance. All of
the Municipality's departments have clear links to some, or all, of the goals and objectives of the
CDM plan.
The requirements of Regulation 25/23 of the Electricity Act specify that the plan is to cover only
municipal owned heated/ cooled facilities and facilities related to treatment of water or sewage.
The full list of the Municipality's facilities included in the CDM plan can be found in Table 1 below.
Table 1: Kincardine Facilities and Infrastructure within the Boundaries of this Plan
AddressName
FACILITIES
Municipal Administration Centre
1475 Concession 5
Administrative office
1,337
Kincardine Fire Hall
127 Mahood-
Fire FacilitV
894
Tiverton Fire Hall
15 McLaren St
Fire FacilitV
492
Underwood Municipal Office
1240 Con 6
Administrative Office
304
Armow Women's Institute
810 Con 7
CommunitV Centre
144
Kincardine LibrarV
727 Queen Street
Public Librar
1 567
Tiverton LibrarV
56 King St
Public LibrarV
114
Davidson Centre
601 Durham St
Indoor Recreational facility
534
Tiverton arena
20 McLaren St
Indoor Sports Arena
266
Arts Centre
707 Queen St
Performing Arts FacilitV
254
Armow Garage
796 Con 7
Facility where equipment or vehicles are
maintained or stored
1,022
Public Works 4 Bay Garage
140 Valentine Ave
Facility where equipment or vehicles are
maintained or stored
626
Tiverton Equipment Garage
115 King St
Facility where equipment or vehicles are
maintained or stored
204
Underwood Garage
1240 Con 6
Facility where equipment or vehicles are
maintained or stored
1,394
Name Address Use Area
WATER AND SEWAGE FACILITIES
Water and Sewage Pumping
Stations (9 accounts)
Various
Pumping and/or Treatment of Water
-
Connaught Park L.S
135 Broadway
Treatment of Sewage
-
Durham Street L.S
867 Olde Victoria
Treatment of Sewage
-
Effluent Station
169 Mahood
Treatment of Sewage
-
Briarhill Pum house
36 Con uer ood
Treatment of Water
-
KWWTP
520 Bruce Ave
Treatment of Water
-
Scotts Point Water Works
26 Ze fs Dr
Treatment of Water
-
Underwood Water Works
7 Concession Lot PT
Treatment of Water
-
Village of Tiverton Dent
6 Smith St
Treatment of Water
-
Water Treatment Plant
155 Durham St
Treatment of Water
-
The intent of the CDM Plan is to provide a basis for the Municipality to implement improvements
to its infrastructure and operations that reduce energy use, their associated costs, as well as
environmental effects of the Municipality's activities. It is a living document that will evolve with
the Municipality's energy needs. The CDM Plan should be consistent with other existing planning
documents that relate to energy conservation. The updated CDM Plan will outline the following:
*Current Municipal Energy Overview
*Kincardine Corporate Energy Conservation Commitment
MI *our Successes and Completed Energy Projects
*The Energy Conservation Team
*Energy Conservation Action Plan
2.0 The Current Municipal Energy Overview
How we Manage Energy Today
The management of our energy is a combination of energy data management, energy supply
management, and energy use management.
Energy Data Management: Municipal energy data is managed through the Finance Department.
The supplier invoices are received and summarized on a spreadsheet accordingto location. Senior
management reviews the variances in comparison to the prior 3-month period to identify and
monitor any unusual fluctuations in spending.
Energy Supply Management: Our municipal energy is supplied via a number of providers.
Electricity is supplied by Hydro One and Westario Power on an as needed basis and is priced at
the standard rates offered by the provider. Propane and fuel is obtained from local providers
where appropriate and the commodity price fluctuates according to the market. Natural gas is
now available in areas of Kincardine (supplied by EPCOR) and is currently used at the Davidson
Centre since 2021, Kincardine Fire Hall starting on December 2023 and Tiverton Fire Hall starting
on January 2024.
Our Municipal Energy Needs
The Municipality requires reliable, low-cost, sustainable energy sources delivering energy to the
most efficient facilities and energy -consuming technologies feasible. A natural gas pipeline was
recently constructed by EPCOR, providing access to natural gas to residents and businesses in
Kincardine, including the MUSH sector. This will primarily replace propane and electricity as the
primary heating source at several facilities. Natural Gas is both less expensive and produces close
to 20% less carbon dioxide (GHG gases) per BTU than Propane when combusted.
The Municipality anticipates significant growth in the upcoming years and expects energy
consumption to grow with the population. As such, additional infrastructure will need to be
available, and energy conservation will therefore need to be woven into all improvement to
ensure energy use and costs are optimized.
Stakeholder Needs:
In order to implement a successful Energy CDM Plan and achieve the conservation targets set
forth in this plan, there must be adequate resources allocated towards energy planning
initiatives. This will require both a financial commitment from Council through the annual budget
process, as well as adequate staff resources and training. The overall conservation vision and
energy consumption reduction targets cannot be achieved without the support of key
stakeholders.
Strategic Energy Conservation Planning
The Municipality will develop and implement energy policies, organize for energy management,
develop the required skills and knowledge, manage energy information, communicate with
stakeholders, and invest in energy management measures. As an integral component of the
management structure, the CDM plan is to be coordinated with the Municipality's asset
management plan, budgeting process purchasing policy, preventative maintenance plans, and
the policy development process.
The availability of natural gas in parts of the community in the near future will also impact energy
use at the Municipality. Natural gas is more cost effective than propane and electricity for heating
spaces and, compared to propane, natural gas is generally a cleaner and more efficient energy
source.
3.0 Kincardine's Corporate Energy Conservation Commitment
The following section outlines the Municipality's commitment to, and vision for, energy
conservation. Delivery of this vision will involve a collaborative effort to increase education,
awareness, and understanding of energy management within the Municipality. While
commitment from Council and Senior Management is required, all staff have a role in energy
usage, and to display appropriate leadership within corporate facilities and operation.
Declaration of Commitment
The Municipality of Kincardine will allocate the necessary resources to implement the Energy
Conservation and Demand Management (CDM) Plan as required under Ontario Regulation 25123
of the Electricity Act.
Council is committed to energy conservation and planning and will allocate resources to update
the plan as required. Staff and council will strive to achieve the objectives presented in this plan
and monitor progress on an ongoing basis. Staff and council will update the plan as required
under Regulation 25123 of the Electricity Act or any subsequent legislation.
Our Conservation Vision
The Municipality of Kincardine will strive to continually reduce energy
consumption and the associated greenhouse gases while maintaining a high
level of service to our community.
This aligns with the Municipality's new Integrated Strategy, which was developed in 2023. The
Municipality's vision aspires for Energy, Opportunity, and Balanced Lifestyle across the
organization.
Our Goals
1. Maximize fiscal resources and mitigate future energy cost increases
through directand indirect energy savings.
2. Reduce the environmental impact of the Municipality's operations.
3. Increase the comfort and safety of staff and patrons of the Municipality's facilities
4. Create a culture of conservation within the Municipality.
Our Objectives
In order to meet the strategic goals of the CDM plan, there are several objectives that align with
its development and implementation:
A. Energy Efficiency Standards: Ensure energy efficiency measures are
incorporated consistently across all municipal facilities, and standards are
incorporated into purchasing practices.
B. Energy Monitoring and Tracking: Monitor and report on energy consumption
annually. Staff have implemented a review process of utility bills related to
energy on a monthly basis. Staff will also measure and verify the actual savings
and return on investment of delivered energy.
C. Training and Capacity Development: Raise staff and Council awareness
around energy efficiency. This will include communicating successes to both
internal and external stakeholders and providing energy training to key staff
members.
Our Energy Conservation Target
It is anticipated that Kincardine will experience significant growth over the next 5-10 years.
Municipal infrastructure and community buildings will be utilized more leading to higher energy
consumption. The Municipality will continue to seek reductions in energy consumption in light of
anticipated population increases.
Reduce energy consumption by 5% compared to 2021 over a 5-year period for all
those facilities reported under Regulation 25/23 of the Electricity Act.
The Municipality's target to achieve 5% energy savings over 5-year periods starting from 2012
has been achieved consistently and targets have been exceeded. The on -going efforts to
implement energy conservation measure by the Municipality has proven to be effective.
Compared to the original 2012 baseline year, 2016 saw a]
reduction of 10% in energy consumption (ekWh)and green
house has emissions (GHGs) dropped approximatley 08%.
2021 realized a 20% reduction in energy consumption
(ekWh) and approximatley 34% reduction in GHGs
compared to 2D16.
With the replacement of propane with natural gas at the Davidson Centre, and the Kincardine
and Tiverton Fire Halls, it is anticipated that GHG emissions will continue on its downward trend.
The future 2029 CDM update will compare the recent 5-year energy usage (2021 vs. 2026) to
determine if the 5% energy reduction target was achieved. The energy reduction target is
approximately 350 eMWh.
In addition to the Municipality benefitting from reducing its energy use, residents and local
businesses also benefit from more efficient use of taxpayer dollars and better
maintained/operated public buildings and facilities. These efforts aligns with Kincardine's
organizational vision and mission to plan for a sustainable future and enhancing quality of life.
Integrated Strategy Focus Areas
The Municipality is committed to the
promotion of responsible energy
management through the implementation
of economically viable energy efficiencies
and environmental care throughout all
facilities, plants and equipment. The
Municipality will take reasonable efforts to
minimize impacts to the environment when
allocating resources, while recognizing the
needs of our community.
SUPPQrLjFkg
respansible
and effectitie
graver-nment
Fostering a resilient
ecomorry
fnhanaing Quality of Life
4.0 Our Successes and Completed Energy Projects
Planning far
a mstainahle
future
The Municipality has competed a number of energy conservation projects from 2019 - 2024
which have contributed significantly to the control of energy consumption and costs. The
Municipality has reduced its energy consumption by approximately 28% compared to the 2012
base year. This is an excellent example of how dedicated staff, with a commitment to efficiency
and a structured plan, can make a difference.
A list of 34 completed energy conservation measures from 2019 — 2024 can be found in Table 2
below. These are energy conservation projects that were identified in the 2019 CDM update
which were completed. The list illustrates the Municipality's leadership and commitment to
actively managing energy consumption.
Table 2: Completed Energy
Conservation
Projects 2019 — 2024
Facility
Project Type
Description
Arts Centre
Heating
Controls
Installed programmable thermostats for
space heating and program setbacks for
unoccupied periods.
Upgraded existing T12 fluorescent lighting
Arts Centre
Lighting
Interior Upgrade
to T8 lamps with electronic ballasts. Include
replacement of all GU10 and MR16 lamps
with LED.
Municipal
Administration
Heating/Cooling
Program
Program temperature setbacks during
Centre
temperature
unoccupied periods both in the summer to
setbacks
reduce A/C load and winter to reduce
heating load.
Municipal
Upgrade remaining
Administration
Lighting
fluorescent lights to
Changed T8 lighting to LED on upper level
Centre
of building.
LED
Replace existing ice
Replaced existing Freon ice plant with
Davidson Centre
Chillers
plant with new
new ammonia system. Investigate
ammonia system
incorporating premium efficiency
motors, enabling floating head pressure,
VFDs on brine pumps.
Davidson Centre
Lighting
Replace MH rink
Upgraded arena rink lighting from MH to
lighting with LED
LED technology.
Davidson Centre
Lighting
Replace Pool area
Upgraded high bay lighting around
lighting with LED
perimeter of pool from MH to LED
technology.
Davidson Centre
Lighting
Upgrade Exterior
Upgraded exterior HID wall packs to LED
Lighting
technology.
Install Line -Voltage
Fire Hall, Tiverton
Heating
Programmable
Installed programmable digital wall
Thermostats on
thermostats for all wall mounted electric
Electric Baseboard
baseboard heaters.
Heaters
Fire Hall, Tiverton
Heating
Upgrade plug in heaters
Replaced plug in electric space heaters
with panel radiant heaters.
Facility
Project Type
Description
Details
Fire Hall, Tiverton
Lighting
Upgrade Exterior
Upgraded wall pack lights on exterior
Lighting
above doors HPS to LED fixtures.
Programmable Set -Back
Installed Programmable Set -Back
Garage, All
Heating
Thermostats for
Thermostats on the Propane Unit
Propane Unit Heaters
Heaters in Bays. Reduced evening
temperatures by about 4 degrees during
unoccupied times, returning
temperature in the morning as required
Garage, Armow
Building
Bay Doors
Replaced 3 large bay doors with high R-
Envelope
value insulated material.
Garage, Armow
Lighting
Interior Lighting
Upgraded T12 fluorescent lighting to LED.
Upgrade
Upgrade Window A/C
Replaced the existing window Air
Garage, Kincardine
A/C
Unit to Energy Star
Conditioning Unit with an Energy Star
Rated A/C Unit
Rated unit.
Garage, Kincardine
Lighting
Interior Lighting
Upgraded T8 fluorescent lighting to LED
Upgrade
with motion sensors.
Garage, Underwood
Building
Windows
Replaced four (4) older aluminum
Envelope
frame windows with energy efficient
low -3 thermal windows.
Garage, Underwood
Lighting
Exterior Lighting
Upgraded exterior HID lighting to LED wall
Upgrade
packs.
Garage, Underwood
Lighting
Interior Lighting
Upgraded T8 fluorescent lighting to LED
Upgrade
with motion sensors.
Garage, Underwood
Lighting
Interior Lighting
Upgraded highbay lighting with LED with
Upgrade
motion sensors.
Garage, Underwood
Building
Insulation
Added insulation in office walls and around
Envelope
exhaust fans to reduce heat losses
Electric DHW Heater -
Replaced the existing Electric Element
Garages: Armow,
DHW
Efficiency Upgrade
(4.5 kW's) domestic hot water tank
Underwood
heater with high efficiency electric.
Garages:
Electric DHW Heater -
Replaced the existing Electric Element (4.5
Kincardine,
DHW
Efficiency Upgrade
kW's) domestic hot water tank heater
Tiverton
with high efficiency electric.
Library, Kincardine
Lighting
Interior Upgrade
Updated upper level lighting to LED.
Facility
Project Type
Description
Details
Library, Tiverton
Heating
Controls
Installed programmable wall thermostats
on electric baseboard heaters.
Medical Clinic
Heating
Controls
Programmed temperature setbacks during
unoccupied periods both in the summer to
reduce A/C load and winter to reduce
heating load.
Medical Clinic
Lighting
Interior Upgrade
Replaced T12 and T8 Fluorescent lighting
with LED.
Tiverton arena
Lighting
Upgrade Rink Lighting
Upgraded (21) 1000W MH fixtures over ice
surface to LED technology (option to TS).
Underwood
Heating
Upgrade Heat Pump
Replaced existing heat pump with new
Community Centre
energy efficient air-to-air heat pump.
Kincardine WWTP
Process
Aeration Upgrade
Upgraded mechanical mixers with
Equipment
diffused air system and positive
displacement blowers in 2023.
Kincardine WWTP
Lighting
Upgrade
Supplier has completed a
walkthrough and upgrades are to
begin in 2019 and run for several
Kincardine WTP and
Plant lighting will be changed to TS high
BEC WWTP
Lighting
Upgrade
output in office and garage as well as BEC.
Supplier report to follow. Upgrades to
begin in 2019 and run for several years as
budget permits.
Kincardine WTP
Lighting
Upgrade
Supplier has completed a
walkthrough and upgrades are to
begin in 2019 and run for several
Various Well and
Supplier has completed a
Sewage Pumping
Lighting
g g
Upgrade
pg
walkthrough and upgrades are to
Stations
begin in 2019 and run for several
years as budget permits.
5.0 The Energy Conservation Team
The Municipality's team described below will continue to be responsible for delivering the plan's
vision, objectives and goals as well as maintaining the Municipality's focus on energy efficiency
in the years to come.
Energy Leader:
The Chief Administrative Officer (CAO) is assigned overall responsibility for corporate energy
management.
Energy Conservation Champion — CAO:
The role of the Energy Conservation Champion is to provide clear guidance, assistance and
support to the conservation team on internal and external funding mechanisms and to include
the team in relevant decision -making and budget discussions. Community Services, Corporate
Services, and Infrastructure and Development will provide key support to the CAO.
This role will also be responsible for providing the energy consumption data on a monthly basis
to the facilities staff, and on an annual basis to council for review and tracking.
The Energy Conservation Champion will support the use of life cycle costing and discounted cash
flow -based assessments for capital projects and will include energy efficiency in procurement
criteria where relevant. In addition, the Energy Conservation Champion will ensure that suppliers
offer energy efficient alternatives/options where available and include energy
criteria/performance in service contracts. This will be supported by Finance as required.
Energy Conservation Team — Senior Leadership Team (SLT), Community Services Team and
Infrastructure and Development Team:
The Energy Management Champions will have direct knowledge of the Municipality's major
energy -using facilities and assets and are responsible for developing and maintaining the focus
on energy conservation. The conservation team will ensure the delivery of energy conservation
measures in each of the facilities and will be responsible for the consumption of energy within
their respective departments. As such, they will be tasked with reviewing facility energy
consumption data on a monthly basis, managing energy issues as required.
6.0 Current and Historical Energy Results
This section reviews the current and historical Kincardine building energy usage. Electricity,
propane and fuel consumption was obtained from annual Energy Consumption and Greenhouse
Gas Emissions Reporting spreadsheets, and summarized energy data provided by the
Municipality. A summary of the annual energy consumption starting from the baseline year of
2012 is displayed in Table 3. The annual fuel, propane and natural gas consumption was
converted to equivalent energy (ekWh) to determine the total energy usage. It should be noted
that the reported annual propane consumption for the 2012 baseline year and 2016 reporting
year were significantly understated (for the Davidson Centre) in the previous CDM plan. This has
been corrected in this 2024 CDM update and the correct values are shown below. In 2012, the
Municipality consumed approximately 9,000 eMWh and was responsible for approximately 1,085
tonnes of GHG emissions. This was significantly reduced in 2016 and further in 2021 (CDM
baseline and reporting years bolded in Table 3).
able 3: Historical
Year
2012
Enerav and GHG
Electricity
(kWh)
6,687,325
Emissions
Fuel •
2,519
for Kincardine
PropaneTotal
329,731
Facilities and Water
-
& Sewage
9,035,252
Approx.
GHG
1,085
2013
5,798,899
8,907
344,718
-
8,327,598
1,000
2014
5,781,157
16,378
342,969
-
8,385,767
811
2015
5,952,457
13,474
365,696
-
8,682,570
847
2016
6,035,231
564
294,365
-
8,111,439
670
2017
5,709,525
564
304,575
-
7,857,516
642
2018
5,649,011
3,318
361,530
-
8,229,929
737
2019
5,315,870
3,922
362,680
-
7,912,003
731
2020
4,697,996
2,621
2911025
-
6,775,004
598
2021
4,962,488
1,370
69,448
95,696
6,458,518
444
As indicated in Table 3, Kincardine has achieved an impressive 20% reduction in energy
consumption over the 5-year period of 2016 to 2021. In addition, the associated GHG emissions
were reduced by approximately 59% since 2012. Figure 1 displays the recently reported annual
energy consumption by all Kincardine buildings for this CDM plan. The graph shows a steady
decline in energy consumption.
10,000,o00
9,000,000
8,000,000
L
y 7,000,000
c
0
rL 6,000,000
E
0
5,000,000
0
u
4,000,000
a`)
c
u' 3,000,000
m
Y
~ 2,000,000
1,000,000
0
2012 Baseline: 9,035,252 ekWh
6,775,004
6,458,518
2017 2018 2019 2020 2021
■ Electricity (kWh) Fuel Oil (ekWh) ■ Propane (ekWh) ■ Natural Gas (ekWh)
Figure 1: Total Annual Energy Consumption (ekWh) for all Reported Kincardine Facilities (2017 — 2021)
Figure 2 illustrates that the Municipality facilities rely primarily on electricity for energy and
heating, with natural gas and propane used as the primary heating energy in some facilities (non-
water/wastewater). Fuel oil is only used in minor quantities. Kincardine looks to implement
natural gas for heating at more facilities for overall cost savings and GHG emissions reduction.
Energy Consumption Breakdown by Type (2021)
Natural Gas (ekWh
15.4%
Propane(ekWh)
7.6%
Fuel Oil (ekWh)
0.3%
Electricity (kWh
76.8%
■ Electricity (kWh) Fuel Oil (ekWh) ■ Propane (ekWh) ■ Natural Gas (ekWh)
Figure 2: Energy Consumption Breakdown by Fuel Type (2021)
Figure 3 shows the energy consumption in 2021 by building type. Indoor recreation facilities
consumes the most energy (ekWh) primarily due to propane being consumed. This is evident
when reviewing Figure 4. In terms of electricity consumption (kWh) alone, water and wastewater
treatment facilities are the highest consumers.
2021 Total Energy Consumption by Building Type (ekWh)
Indoor Recreational Facilltles
Water and Wastewater Treatment Facilities
Administrative Offices -
Vehicle and Equipment Storage Facilltles -
Water and Wastewater Pumping Facilities
Performing Arts Facilities
0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 3,000,000 3,500,000
Figure 3: 2021 Total Energy Consumption (ekWh) by Building Type
2021 Electricity Consumption by Building Type (kWh)
Water and Wastewater Treatment Facilities
Indoor Recreational Facilities
Administrative Offices -
Water and Wastewater Pumping Facilities -
Vehicle and Equipment Storage Facilities
Performing Arts Facilities
0 500,000 1,000,000 1,500,000 2,000,000 2,500,000
Figure 4: 2021 Electricity Consumption (kWh) by Building Type
Figure 5 breaks down the annual energy consumption for all Kincardine facilities (non-
water/wastewater) from 2017 to 2021. The highest energy consumer, by a significant amount, is
the Davidson Centre. This facility is a sports recreation facility that houses swimming pools, ice
rink, gym, courts etc. The upgrades to the ice system, rink/pool lights and exterior lights have
proven to save a significant amount of energy. The Davidson Centre has realized electricity
savings of about 435 eMWh from 2016 to 2021 (25% reduction). The switch over from propane
to natural gas occurred in 2021 for this facility.
4,000,000
3,500,000
t
Y 3,000,000
d
c
0 2,500,000
a
E
2,000,000
u°
t 1,500,000
c
W
1,000,000
0
f
500,000
oa
Say `,e2�
Qa rarc� ors 111
a¢ \paaea ``�
b Qee
J
■ 2017 ■ 2018 ■ 2019 ■ 2020 ■ 2021
Figure 5: Annual Energy Consumption for Kincardine Facilities (2017 — 2021)
Figure 6 displays the annual energy consumption for all water & wastewater facilities in
Kincardine from 2017 to 2021. The WTP, BEC and Kincardine WWTP are the highest energy
consumers. The fluctuations in the electricity consumption at these facilities are directly related
to the flow experienced at each plant. Increase in population/seasonal population, and increases
in significant climate events (i.e. droughts, heavy rain events etc.) typically cause changes in
energy consumption. It should be noted that BEC saw a significant decrease in annual flow, which
resulted in over 60% of electricity usage reduction.
I,200,000
t �,nno,onn
� Soo.000
600,000
`o
'm 400,000
r z00000 1 II II �IIII IIIII 11111 1Irlu 11411 milli Neill ■■■KI ■■■■■ ■■■■.
as
D`
s
■ 2017 ■ 2018 ■ 2019 ■ 2020 ■ 2021
Figure 6: Annual Energy Consumption for Kincardine Water & Wastewater Facilities (2017 - 2021)
The Davidson Centre, Water Treatment Plant, Tiverton Arena, Municipal Administration Centre
and Kincardine WWTP are the five largest energy consumers of Kincardine in 2021, responsible
for 68% of the total energy consumption.
7.0 Renewable Energy
Renewable Energy Utilized or Planned:
Renewable energy is generated from natural sources such as sunlight, wind, and geothermal heat.
Currently the Municipality has geothermal heat pumps used to regulate building temperatures at
the Municipal Administration Centre and the Underwood Community Centre. In addition to these
systems, the Municipality is also home to wind generation facilities.
The Municipality does not currently have any plans for new renewable energy generation.
8.0 Plan Implementation
Ontario Regulation 25123 promotes increased municipal energy management and engagement.
The main driver for municipalities to change the way energy is used relates to fiscal benefits and
financial incentives. Energy is a manageable input to the business process, much like any other
resource cost. Kincardine is maintaining and developing current and planned services that
continue to be affordable to taxpayers.
This CDM Plan provides the "big picture" view as an ongoing framework for optimizing overall
energy use and achieving success.
Current practices must be enhanced and new approaches must be developed. In order to
enhance the current practices, both human and financial resources for systems will be required.
To meet these needs, the Municipality will consider designing a comprehensive program for
collecting and analyzing monthly energy billing information, and ensuring that staff is informed
about energy consumption. The resulting energy costs and consumption database will be used
to monitor excessive variations, target facility follow-up assessments, and determine areas that
could be candidates for improved conservation. These monitoring enhancements will improve
Kincardine's understanding of the bottom line impact of energy management.
In order to establish a baseline for managing energy costs, the Municipality has captured
information critical to energy management planning. This formalizes the process involved in
understanding the relative magnitude of energy costs, the possible ways to reduce energy use,
energy targets that are likely to be achievable, and other associated activities that need to occur.
CDM Planning is intended to be a process of "continuous improvement." The Municipality follows
NRCAN, ISO 50001's four step plan —do —check —act management methodology, used in business
for the control and continuous improvement of processes.
X.
Check
PLAN
Establish the energy conservation objectives and processes necessary to deliver results in
accordance with the expected outputs: the energy conservation targets or goals. Start on a small
scale to test possible effects and financial feasibility. Develop an Energy Conservation Demand
Management Plan prioritizing budgets, resources, and timelines.
DO
Implement the plan and collect data for analysis in the following "CHECK" and "ACT" steps.
Develop projects' design and execution, preparing status reports, and implementing the
communication strategy.
CHECK
Study the actual results (measured and collected in "DO" above) and compare against the
expected results (targets or goals from the "PLAN") to ascertain any differences. Evaluate any
deviations in implementation from the plan and evaluate the appropriateness and completeness
of the plan to enable the execution, i.e., "Do".
ACT
Recommend improvements and adjustments to the initial plan; determine the course of
corrections and modifications to the plan.
The Municipality implements tools to maintain and continually improve energy conservation and
demand management. Benchmarking is the process that the Municipality has implemented for
collecting, analyzing and relating energy performance data of comparable activities to evaluate
and compare performance between or within entities.
The detailed energy conservation project planning process is visually illustrated below.
Energy Conservation Project Planning Process'
1 Energy Efficiency Planning and Management Guide, CIPEC, 2002
Plan Do fnerx I Act
I
I
Obtain insight Creale awareness r-:iu;1= Carve t
I (energy audits deficiencies
I
Get management Trai n key VerIN Review original
commitment rREDurces e==c = I i. _ - _{{ enp-r& pDli yr
I N Dminate energy Implement Examine Review objectives
champion projects oppormnil iez'_r and targets
canti Dual
4 improuemen:
I
PDlkyr, objentives, Alan ilor program Review energy
structure program)I
I Assign Lic k in the gains — Update action
responsibilities Sex new targets plans
Develop Ccmmun:ca'a Start the cycle
I programs) results anew
I
Set targets and Celebrate success I
measures I
I4V I
I Set priorities I
I I
I � I
I Develop action I
I plans I
I
I
I
— — — — — — — — , , _ _ _ — — — — — — — , , —
0 Lain & Anex are. lix., 2Daa
9.0 Update and Review Process
Energy Plan Review:
As part of any energy management strategy, continuous monitoring, verification, and reporting
is an essential tool to track consumption and cost savings/avoidance as a result of implemented
initiatives. The Municipality will endeavor to create a useful energy reporting mechanism for key
facility staff to ensure opportunities are managed appropriately.
As part of the Energy Plan, the implemented process improvements and projects will continue to
be documented and reviewed annually to update consumption savings. By regularly monitoring
consumption and cost savings/avoidance to its departments, the outcomes of the Municipality's
participation in energy management initiatives can be demonstrated, and feedback can be
obtained for any new ideas.
This monitoring will also align with the requirements of Regulation 25/23 of the Electricity Act
and/or any subsequent legislation related to energy management.
10.0 Energy Conservation Action Plan
A critical part of any plan is the detailed list of specific actions needed to achieve the desired
goals and objectives. The Municipality of Kincardine has developed a list of key projects that will
help ensure the Municipality meets the energy reduction goals and targets set out in the
Corporate Energy Conservation Commitment (see Section 3.0).
The plan has been divided into the following sections:
A. Creating a Culture of Conservation
B. Energy Efficiency Standards and Policies
C. Energy Monitoring and Tracking
D. Energy Conservation Action Plan
Creating a Culture of Conservation
Energy Training: The Municipality will develop and deliver energy training for relevant staff
members. This training will not be limited to operators and maintainers with "hands-on"
involvement in energy consuming equipment but will also include others since they also make
energy consumption decisions in their daily work. Training focused on energy use, energy costing
and conservation opportunities associated with employee job functions will be provided. (The
Municipality of Kincardine will utilize both internal and external resources to provide this training
as appropriate). Energy training will be a new cost that has budgetary implications.
Energy Efficiency Standards
Procurement Planning
The intent is to make Life Cycle Cost Analysis part of the normal course of business for all facility
and operational retrofits, including capital renewal and life cycle replacements projects. Success
means incorporating energy efficient options at the initial stages of a project design. This ensures
that options for improving energy efficiency are considered, evaluated and quantified in terms of
life cycle analysis, including cost, maintenance and emission levels. As energy is a major
component of the operating costs of municipal facilities, energy costs will be considered in the
lifecycle costing and procurement policies of the Municipality.
Consideration of energy efficiency of acquired equipment: Purchasing procedures will be
modified as required to incorporate energy efficiency into the criteria for appropriate materials
and equipment.
Implementation Planning
Building Standards: M unicipa lity staff will develop criteria for the design and/or acquisition of new
buildings that include energy performance factors and that use as appropriate the principles
embedded in performance standards such as the Model National Energy Code for Buildings.
The Municipality of Kincardine will investigate adopting such a standard for new buildings.
Energy Monitoring and Tracking
Energy Consumption: Municipality staff will review and evaluate our energy plan, revising and
updating it as necessary, based on the Energy Consumption Reports that are submitted to the
Ontario Government on an annual basis as required under Regulation 25123. Monthly billing
review will provide an opportunityto identify and recover any billing errors, or usage that requires
further investigation.
Green House Gas Emissions: Governments at all levels are moving to address emissions of GHGs,
in light of scientific evidence on how human activities are affecting the world's climate. For more
information on the science, see http://www.ipcc.ch/. The combustion of fossil fuels in buildings
is a major source of GHG emissions that fall under local government influence. Municipalities can
lower emissions by improving energy efficiency of buildings and using more renewable energy.
The Municipality is committed to both objectives through the development and implementation
of this CDM plan. We will continue to track and report on GHGs as part of our regular reporting
on energy consumption and will evaluate progress in this area against our overall reduction
target.
Energy Conservation Action Plan
The detailed list of projects included in the plan, which covers a period from July 2024 to June
2029, can be found in Appendix A.
The projects fall under the following broad categories; organizational improvements, lighting,
heating, building envelope, chillers, domestic hot water (DHW), and general equipment
improvements and process optimization.
Appendix A:
Kincardine Energy Conservation Action Plan
Kincardine Energy Conservation Work Plan 2024-2029
No
Facility
Project Type
Description
Details
Arrange training for key staff on energy staff that covers energy sources,
1
Across
Standard or
Energy Training
financing, technology and conservation. Consider LAS AMO's Energy Efficient
g� gy / gy
Organization
Program
Building Operations 101 that is 50% subsidized by the ISO (with a potential
additional 25% from natural gas suppliers) and can be customized.
Across
Standard or
Procurement
Incorporate Life Cycle Costing (LCC) into procurement processes as appropriate.
2
Organization
Program
Practices -
Specifically include a requirement to specify power, energy consumption levels,
Incorporate
and energy efficiency ratings in requests for proposal and quotation from
Energy
suppliers as deemed fit.
3
Across
Standard or
Monitoring and
Investigate options for online energy tracking service to review and track
Organization
Program
Tracking Energy
electricity consumption at each facility.
Use
Municipal
4
Administration
Heating
Upgrade plug in
Replace plug in space heaters with radiant panel heaters with timers and/or
Centre
heaters
motion sensors
Upgrade interior T12 fluorescent lighting to T8 technology with electronic
5
Davidson Centre
Lighting
Interior Upgrade
ballasts. Retrofit hall lighting to T5 technology. Relamp entire building using
Install New
Fire Hall,
Programmable
6
Heating
Set -Back
Install programmable digital wall thermostats for all wall mounted electric
Kincardine
baseboard heaters.
Thermostats for
7
Fire Hall,
HeatingUpgrade
plug m
pg p g�
Replacement of plug in electric space heaters with panel radiant heaters
p p g� p
Kincardine
heaters
Fire Hall,
Upgrade all interior lighting from T12 fluorescent to T8 lamps with electronic
8
Kincardine
Lighting
Interior Lighting
ballasts. Include in project to upgrade all exit signage bulbs from incandescent
Upgrade
to LED. Investigate Small Business Lighting Program for incentives, if not already
being used.
9
Fire Hall,
Lighting
g g
Upgrade
pg p p g g
Upgrade exterior wall packs and pole lighting from HID to LED technology.
Kincardine
Exterior Lighting
to LED
Install
Install Programmable Setback Thermostats on all office Electric Baseboard
10
Garage, All
Heating
Line -
Heaters. Setback night time space temperatures. The Mechanics Room and
Voltage
Lunch Room have these electric baseboard heaters.
Programm
able
Thermostats
11
Garage, Armow
Building
Bay Doors
Replace 3 large bay doors with high R-value insulated material.
Envelope
It is recommended to install a refrigeration plant controller such as a CIMCO
Install
6000E system which will provide floating head pressure control, brine pump
12
Tiverton arena
Chillers
Refrigeration
speed control, ice surface temperature control and other features. The
Plant Controller
system will provide accurate control of ice temperature, brine pump energy
for Floating
savings, compressor energy savings and will adjust with outdoor temperature
Head Pressure
and thermal loading on the ice pad. Itcan be programmed and scheduled
Control and
according to occupant requirements and settings are easily changed.
Scheduling
No
Facility
Project Type
Description
Details
Replace Kitchen
The Kitchen Area uses a small electric domestic hot water heater. It is
13
Electric Water
recommended to replace this unit with propane fired, instantaneous domestic
Tiverton arena
DHW
Heater with
hot water heater. This w ill reduce standby heating losses from the hot water
Propane
tank. Savings are estimated for electric heat standby losses only, additional
Instantaneous
savings are available from fuel switching to propane. The water lines should
Domestic Hot
have insulation added to them to reduce radiant heat losses.
Water Heater
There is currently one large (100 Gallon, 8 kWs each approximately) electric
Domestic Hot Water Tank Heater used to supply hot water to the dressing
Replace
room that has not been updated. This unit has a large electrical demand (kW)
14
Tiverton arena
DHW
Electric
and is an older model, with scaling which reduces heating efficiency. By
Domestic
replacing these units with high efficiency propane- fueled DHW tank heaters,
Hot Water
electrical consumption and demand charges will be saved. An alternative is
Tank Heater
to use Instantaneous Domestic Hot Water Tank Heaters to reduce stand-by
with Propane
losses. At a minimum, the existing tanks should be insulated with blanket
Fired Heater
insulation to reduce stand-by losses. Savings is based on reduced stand-by losses
only. Additional savings from fuel switch and efficiency increase will also be
achieved.
Programmable
Install Programmable Set -Back Thermostats on electric space heating in all Change
15
Tiverton arena
Heating
Set -Back
Rooms. The existing electric heating units within all Change Rooms are manually
Thermostats on
controlled and can remain on during unoccupied periods. It is recommended to
Change Room
install programmable units on all electric heaters to shut them off when not
Electric Heaters
required.
Upgrade all interior lighting from T12 fluorescent to T8 lamps with electronic
16
Tiverton arena
Lighting
Interior Lighting
Upgrade
ballasts. Include in project to upgrade all exit signage bulbs from incandescent
to LED. 50% Complete.
17
Tiverton arena
Lighting
Install
Install occupancy sensors in washrooms and dressing rooms to automatically
occupancy
shut off lights when unoccupied. Tie in exhaust fans w here possible. 70%
sensors in
Complete.
various rooms
18
Tiverton arena
Lighting
Upgrade Rink
Upgrade (21) 1000W MH fixtures over ice surface to LED technology (option to
Lighting
T5).
19
Tiverton arena
Lighting
Upgrade Exterior
Upgrade exterior wall packs to LED technology.
Lighting
Install High
It is recommended to replace the existing 4 kVA electrical transformer in the
Efficiency 4 kVA
Storage Room area of the Arena to reduce electrical stand-by losses. The existing
20
Tiverton arena
Transformer
Electrical
transformer uses power even when not loaded by lighting loads, which is greatly
Transformer
reduced by installing a high efficiency transformer. All similar transformers
in Storage
should be replaced as well as this equipment operates 8760 hours per year.
Room
(Lighting
Equipment)
21
Underwood
Heating
Controls
Program temperature setbacks during unoccupied periods both in the summer
Community Centre
to reduce A/C load and w inter to reduce heating load.
22
Underwood
Lighting
Interior Upgrade
Upgrade T12 Fluorescent lighting to LED.
Community Centre
No Facility Project•Description Details
23 Kincardine WTP Process Optimization Evaluate possibility of modifying production schedule to transfer burden of
Equipment energy intensive processes to off-peak times.
24 Scott Point Well Process Upgrade The duty pump's high lift motor has been upgraded while the stand-by will be
Equipment upgraded prior to the duty's expected end -of -life. Upgrade to one pump is
complete; looking at the other in 2024.